Original source · versioned page text
Attachment 1B - Approval 2006-2237 - Stage 2B
Attached to the e-mail MCU16/0075 Development Application - 90 Beach Road Noosa North Shore.
2006/2237
31. The internal sewerage reticulation system shall be designated as “private sewers” with all
operations and maintenance requirements the responsibility of the property owner/body
corporate.
32. Sewer house connection drains shall be located within the disturbance area for the driveway if
practicable.
33. Occupation of the eco-cabins and/or leisure centre shall not commence until such time as the
sewerage system is fully operational and connected to a permanent sewerage treatment
facility and disposal area as approved by the EPA.
Water supply
34. Water supply infrastructure shall be designed to ensure consistency with OO8c), OO15,
Section 6.4 and Schedule F – 9.6.10 of the Noosa North Shore Eco-Tourism Portal
Development Code.
Roadworks Contributions (Local Road Network)
35. A roadworks contribution of $14,316 towards the upgrading of Moorindil Street shall be paid to
the Council prior to the commencement of the use of Stage Two. This amount will be subject
to variations in the Consumer Price Index, All Groups Brisbane from December 2006 until the
date of payment. The money will be used to assist Council with the cost of roundabout
improvements along Moorindil Street.
Erosion and Sediment Control
36. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Management Plans
37. The applicant shall submit reports for Stage Two in accordance with the Environmental
Management Strategy as outlined in Section 6 of the Noosa North Shore Eco-Tourism Portal
Development Code, unless previously approved by Council for all stages. These reports shall
be submitted for approval in conjunction with Operational Works application for Stage Two.
General
38. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
39. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
40. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Environmental Health
41. The developer must provide waste storage and disposal facilities at this development in
accordance with Planning Scheme Policy “Waste Management Multi-Dwellings and
Commercial and Industrial Premises”, including an external imperviously paved area correctly
sized for all refuse and recycling containers and suitably screened from public places and
neighboring properties. A wash down area is required with a cold-water tap, hose and drain
outlet connected to septic system or approved absorption trench. The drain outlet is to be
designed to prevent storm water entry to the absorption trench.
Page 7 of 17
Print Date: 24 April 2015, 3:55 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 1B - Approval 2006-2237 - Stage 2B.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.