« . Project No. 306-2474
November, 2006 Page 8
TT Page
Service
Trench
a "
All footings 300mm
below this line me
30 degrees _
<< —>>
1.0m
@ FIGURE 1
6.5 Slab On Ground
6.5.71 General
Field and laboratory test results indicate that the existing in-situ soils, along with any
controlled fill, are suitable for slab on ground construction provided that site preparation
earthworks are carried out in accordance with recommendations in Sections 6.1 and 6.2.
6.5.2 Sub-Base
@ It is suggested that a 150mm layer of sub-base be provided under all concrete slabs.
The sub-base material should be compacted to a density not less than 95% of maximum
dry density in accordance with AS.1289 5.2.1 (Modified compaction). The sub-base is
provided under a concrete slab to:-
* Provide a stable 'working platform' on which to operate construction equipment;
° Facititate the provision of a uniform bearing surface under the slab.
Sub-base material should be of good quality conforming to requirements (minimum) of
Material Type 2.4 as specified in the Queensland Department of Transport, Standard
Specification MRS 11.05, Unbound Pavements (December, 1999).
TT
ZH SOIL SURVEYS ENGINEERINGSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015584F.001.pdfRelated documentPublic source context ↗
07/0528 - Op Works, Landscaping,Access Car Parking & Earthworks - Goode Family Trust [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.