«      .   Project No. 306-2474
           November, 2006                                                                         Page 8
                    TT                                                                           Page

                                                                                    Service
                                                                                    Trench
                                     a "
                             All footings 300mm
                             below this line             me
                                                         30 degrees _
                                                        << —>>
                                                           1.0m
@                                                                               FIGURE 1

            6.5   Slab On Ground
               6.5.71   General
               Field and laboratory test results indicate that the existing in-situ soils, along with any
               controlled fill, are suitable for slab on ground construction provided that site preparation
              earthworks are carried out in accordance with recommendations in Sections 6.1 and 6.2.
              6.5.2    Sub-Base
@             It is suggested that a 150mm layer of sub-base be provided under all concrete slabs.
              The sub-base material should be compacted to a density not less than 95% of maximum
              dry density in accordance with AS.1289 5.2.1 (Modified compaction).     The sub-base is
              provided under a concrete slab to:-
               *   Provide a stable 'working platform' on which to operate construction equipment;
               °  Facititate the provision of a uniform bearing surface under the slab.
              Sub-base material should be of good quality conforming to requirements (minimum) of
              Material Type 2.4 as specified in the Queensland Department of Transport, Standard
             Specification MRS 11.05, Unbound Pavements (December, 1999).

            TT
                                                                 ZH SOIL SURVEYS ENGINEERING

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015584F.001.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.