Attached to the e-mail MCU16/0098 & OPW16/0183 - Request to change existing approval - 21 Venture Drive NOOSAVILLE.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

Noosa Council documents




                                                                                                    MCU16/0098


                              Earthworks
                      52.     All earthworks must be undertaken in accordance with the provisions of AS 3798
                              Guidelines on Earthworks for Commercial and Residential Development, with
                              geotechnical supervision and testing undertaken in accordance with Section 8 of
                              the Standard, and to a minimum of ‘Level 2’ as defined in Appendix B.
                      53.     All Earthworks and construction works must be carried out taking into
                              consideration the protection of any existing above and below surface services, and
                              the stability and protection of fences and any buildings and structures on the
                              adjoining properties.
                              Stormwater Drainage
                      54.     Works associated with this permit must not adversely impact on the existing
                              drainage conditions on other properties including road and public footpath by
                              blocking or interfering with overland flow path.
                      55.     Construction of all internal stormwater drainage works must comply with the
                              relevant section/s of Australian Standard AS/NZS 3500.3.
                              Erosion and Sediment Control
                      56.     Sediment and erosion control measures must be in place prior to works
                              commencing. If such measures are not in place or are not satisfactory, “on the
                              spot” fines may be issued. Such fines can be issued if sediments from the site are
                              found to enter or have the potential to enter Council’s stormwater system, natural
                              waterways, any downstream stormwater filtration system or adversely impacting on
                              other properties. The sediment and erosion control design and measures have
                              NOT been approved, it is the site's Supervising Engineer who is responsible for
                              ensuring that the sediment and erosion control measures have:
                              a.       Been duly designed by an RPEQ or CPESC and constructed in accordance
                                       with "best practise" methods,
                              b.       Been revised by an RPEQ or CPESC to address the issues raised by
                                       changes in the projected construction schedule and/or methods,
                              c.       Been revised to address predicted rainfall events, and
                              d.       Achieve the desired environmental outcomes.
                              Council may request further controls to be installed should the implemented
                              measures be found inefficient.
                      57.     The erosion and sediment control measures must be designed, installed and
                              maintained in accordance with the supervising engineer instructions and the
                              current best practice standards * (Refer to Advisory Note).
                      58.     The applicant must ensure non essential exposure of soil is prevented by
                              restricting the extent of clearing and minimising the duration of soil exposure to
                              adverse weather conditions and effectively turf or stabilise any cleared area
                              without delay and prior to rainfall occurring.
                      59.     The applicant must ensure sediment does not leave the site or enter onto adjoining
                              properties or Council’s drainage system due to surface runoff or on tyres of
                              vehicles and/or machinery. It is essential to implement appropriate approved
                              erosion and sediment control measures throughout the site during all phases of
                              construction including vehicle shakedown pad/grid (or similar) at the access to the
                              construction site.



                                                                                                        Page 10 of 18


Document Set ID: 20204040
Version: 1, Version Date: 22/11/2016                                                            Print Date: 22 November 2016, 1:58 PM
Log in to download the original file

Decison package_Noosa Chocolate Factory.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.