Decison package_Noosa Chocolate Factory
Attached to the e-mail MCU16/0098 & OPW16/0183 - Request to change existing approval - 21 Venture Drive NOOSAVILLE.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
Noosa Council documents
MCU16/0098
Earthworks
52. All earthworks must be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development, with
geotechnical supervision and testing undertaken in accordance with Section 8 of
the Standard, and to a minimum of ‘Level 2’ as defined in Appendix B.
53. All Earthworks and construction works must be carried out taking into
consideration the protection of any existing above and below surface services, and
the stability and protection of fences and any buildings and structures on the
adjoining properties.
Stormwater Drainage
54. Works associated with this permit must not adversely impact on the existing
drainage conditions on other properties including road and public footpath by
blocking or interfering with overland flow path.
55. Construction of all internal stormwater drainage works must comply with the
relevant section/s of Australian Standard AS/NZS 3500.3.
Erosion and Sediment Control
56. Sediment and erosion control measures must be in place prior to works
commencing. If such measures are not in place or are not satisfactory, “on the
spot” fines may be issued. Such fines can be issued if sediments from the site are
found to enter or have the potential to enter Council’s stormwater system, natural
waterways, any downstream stormwater filtration system or adversely impacting on
other properties. The sediment and erosion control design and measures have
NOT been approved, it is the site's Supervising Engineer who is responsible for
ensuring that the sediment and erosion control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance
with "best practise" methods,
b. Been revised by an RPEQ or CPESC to address the issues raised by
changes in the projected construction schedule and/or methods,
c. Been revised to address predicted rainfall events, and
d. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented
measures be found inefficient.
57. The erosion and sediment control measures must be designed, installed and
maintained in accordance with the supervising engineer instructions and the
current best practice standards * (Refer to Advisory Note).
58. The applicant must ensure non essential exposure of soil is prevented by
restricting the extent of clearing and minimising the duration of soil exposure to
adverse weather conditions and effectively turf or stabilise any cleared area
without delay and prior to rainfall occurring.
59. The applicant must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of
vehicles and/or machinery. It is essential to implement appropriate approved
erosion and sediment control measures throughout the site during all phases of
construction including vehicle shakedown pad/grid (or similar) at the access to the
construction site.
Page 10 of 18
Document Set ID: 20204040
Version: 1, Version Date: 22/11/2016 Print Date: 22 November 2016, 1:58 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.