Decison package_Noosa Chocolate Factory
Attached to the e-mail MCU16/0098 & OPW16/0183 - Request to change existing approval - 21 Venture Drive NOOSAVILLE.
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
Noosa Council documents
MCU16/0098
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
obligations under the ACH Act.
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance
with the requirements of the National Construction Code - Building Code of
Australia (Volume 1) as they relate to people with disabilities. Your attention is
also directed to the fact that in addition to the requirements of the National
Construction Code as they relate to people with disabilities, one or more of the
following may impact on the proposed building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's DA Planning
Section to arrange a Development Compliance Inspection.
Infrastructure Charges
4. This Development Permit will trigger an “Infrastructure Charge Notice” to be issued
in accordance with Council’s “Charges Resolution” made pursuant to the
Sustainable Planning Act 2009 and in conjunction with the State Planning
Regulatory Provision (Adopted Charges).
ENGINEERING
General Advisory Notes
5. Council has undertaken an audit check of the Operational Works drawings in
relations to the proposed works. A detailed check of the calculations and drawings
has not been undertaken, as they have been certified by a RPEQ. The RPEQ
bears full responsibility for all aspects of the engineering design. Council reserves
the right to require further amendments and/or additions at a later date should
design errors become apparent.
6. Council reserves the right to call up any performance bond held or levy charges
against the property, should emergency works be required to be undertaken by
Council to make the site safe due to inactivity on the development site for extended
periods of time.
7. Amendments to plans, in accordance to the relevant conditions, and/or any
requested changes to the conditions of this decision notice must be made within
the appeal period or the suspended/extended appeal period. Alternatively, an
application for “Request to change an existing approval” under the Sustainable
Planning Act 2009 must be made along with Council’s applicable fees.
8. It should be noted prior to arranging a pre-start meeting the Right of Appeal Period
of 20 business days should have been passed or the applicant has have confirmed
by a letter or an email that he/she has accepted the conditions of Decision Notice
and waived his/her appeal right.
Page 12 of 18
Document Set ID: 20204040
Version: 1, Version Date: 22/11/2016 Print Date: 22 November 2016, 1:58 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.