Attached to the e-mail MCU16/0098 & OPW16/0183 - Request to change existing approval - 21 Venture Drive NOOSAVILLE.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
Noosa Council documents
MCU16/0098
c. Works programme identifying key components of the works and their
respective durations.
d. The proposed dates for the commencement and the completion of the works.
e. Effective procedures and measures to minimise adverse environmental
impact on other properties and roads users including noise and dust
emission.
f. Establishment of a communication protocol with the adjoining owners and
any other affected parties to advise of construction times, impacts on traffic
and services and any other relevant issues.
g. Identification of communication and complaint management procedures
including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
42. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five
business days of the change occurring.
43. Any alteration to existing services or conflict between the development and an
existing or proposed service must be referred to the relevant service authority for
determination prior to commencement of works.
DURING CONSTRUCTION
General
44. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to
assets must be repaired immediately where it creates a hazard to the community.
In circumstances where the damage does not create a hazard to the community, it
must be repaired immediately on completion of the works associated with the
development.
45. All works must be supervised by a Registered Professional Engineer of
Queensland (RPEQ) who is independent of the Developer and Principal
Contractor, and they must certify that all works conform to the Operational Works
permit. Where municipal works are involved, such confirmation must be submitted
for the respective hold points prior to any site inspection by Council Officers.
46. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans and conditions detailed in this Decision Notice.
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines, particularly PSP 5 – Engineering
Design Standards – Roads, Drainage and Earthworks.
c. The latest version of the Healthy Waterways document “Water Sensitive
Urban Design Technical Design Guidelines for South East Queensland” for
all water quality devices to be constructed on site.
Page 8 of 18
Document Set ID: 20204040
Version: 1, Version Date: 22/11/2016 Print Date: 22 November 2016, 1:58 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.