Council archive · source document
08/0310 - MCU - Wellbeing Type 2 - Social [As Published] · 132008.310
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.0, 3 September 2007
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12
Is any of the propased operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
(0 No
DO Yes
If yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act
2005?
(No
Hf no, is ail of the operational work for constructing or raising waterway barrier works -
intended to exist for no more than 28 days; and
built or raised in freshwater, and
© nomore than 20m in length and no more than 3m in height from the lowest point on the stream bed?
O Yes
OC No
If no, is all of the operational work for constructing or raising waterway barrier works -
¢ more than 100km from the coastline; and
© inthe smallest unbranched tributary of a catchment or a stream into which that tributary flows
OO Yes
{_] No- (Complete Part Os) This application requires assessment by the Department of Primary industries and Fisheries
(DPI&F), If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
(1 Yes
Ifyes, is any of the proposed operational work to be carried out in a wild river high preservation area?
1] No-— Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it (Complete Part O3) This application requires assessment by the Department of Primary
Industries and Fisheries (DPI&F), and, subject to the declaration for the relavant wild river area, assessment for the
purposes of the Wild Rivers Act 2005. if DPI8F is not the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.
(C1 Yes - An application for the operational work would be taken to be not properly made and the Assessment Manager must
refuse to receive it.
IPA, schedule 8. part 1, table 4, item 6
IPA, schedule 8, part 2. table 4, item 2
IP Regulation, schedule 2, table 2, item 28
JP Regulation, schedule 1, part 3, table 4, item 6
Fisheries Act 1994, section 76D (wild river area)
Wild Rivers Act 2005, section 43A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0310 - MCU - Wellbeing Type 2 - Social [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.