REVISED DESIGN - 9 Rules Road - Design Plans - Rev E - 15022026
Plans and drawings: the text below has words only, no drawings.
CONDENSATION MANAGEMENT
(B) SHOWER NOGGING (NOTE: LOCATIONS ARE DIFFERENT IF PLY EXTERNAL WALL CONSTRUCTION
SHEETING IS USED) - WHERE A "PLIABLE BUILDING MEMBRANE" ( I.E. WALL SARKING WHICH COMPLIES WITH AS 4200.1) IS NOT INSTALLED ON THE OUTSIDE OF THE FRAME, A "DRAINED CAVITY" IS REQUIRED.
I.E. NO DIRECT FIX OF LIGHTWEIGHT CLADDING.
MECHANICAL VENTILATION
- DUCTING OF EXHAUST TO OUTSIDE AIR, IS REQUIRED TO:
(A) KITCHEN RANGEHOOD;
(B) BATHROOM;
(C) SANITARY COMPARTMENT; AND
(D) LAUNDRY.
- WHERE A VENTING CLOTHES DRYER IS INSTALLED, IT NEEDS YO BE DUCTED TO OUTSIDE ARE (NOT REQUIRED FOR A CONDENSING CLOTHES DRYER).
- MINIMUM FLOW RATES:
(A) 25 L\S FOR BATHROOM OR SANITARY COMPARTMENT;
(B) 40 L\S FOR KITCHEN OR LAUNDRY.
TIMER FOR MECHANICAL VENTILATION
- REQUIRED FOR A BATHROOM OR SANITARY COMPARTMENT WHICH DOES NOT HAVE COMPLIANT NATURAL VENTILATION.
- A RUN-ON TIMER IS REQUIRED THAT THE EXHAUST SYSTEM CONTINUES TO OPERATE FOR 10 MINUTES AFTER THE LIGHT SWITCH IS TURNED OFF.
- THE EXHAUST SYSTEM IS ALSO TO BE INTERLOCKED WITH THE LIGHT SWITCH.
MAKE-UP AIR
- A ROOM WITHOUT COMPLIANT NATURAL VENTILATION REQUIRES A 14.000m² OPENING TO AN ADJACENT ROOM, E.G. A 20mm UNDERCUT TO A 700mm WIDE DOOR (OR AS PER AS 1668.2 -
AS ADVISED BY ELECTRICAL \ AIR-CONDITIONING INSTALLER).
- A LAUNDRY WITHOUT COMPLIANT NATURAL VENTILATION AND WITH A VENTING CLOTHES DRYER, REQUIRES MAKE-UP AIR TO COMPLY WITH AS 1668.2 - AS ADVISED BY ELECTRICAL \ AIR-
CONDITIONING INSTALLER.
ENERGY EFFICIENCY
NEW ASSESSMENT METHODS
1 OPTIONS
(A) ENERGY RATING SOFTWARE
- 7 STARS REQUIRED; OR
- 6 STARS REQUIRED IF THE HOUSE HAS A 12m² OUTDOOR LIVING AREA WITH 2 OPEN SIDES, AND WITH A R1.5 INSULATED ROOF AND 1200mm DIA. OUTDOOR CEILING FAN (IF THE AREA
IS >15m², A >1200mm CEILING FAN IS REQUIRED.
- A STAR CREDIT IS NO LONGER AVAILABLE FOR A SOLAR ELECTRICAL SYSTEM.
(B) DEEMED-TO-SATISFY NCC 2022.
THESE REQUIREMENTS HAVE BEEN INCREASED AND ARE CONSIDERABLY MORE COMPLEX THAN THE CURRENT SYSTEM.
-DUE TO THE ADDED COMPLEXITY, ENERGY CONSULTANTS FEES WILL LIKELY INCREASE.
"WHOLE OF HOME" RATING
- WHEN USING ENERGY RATING SOFTWARE, A "NET EQUIVALENT ENERGY USAGE" CALCULATION IS REQUIRED TO GIVE A WHOLE-OF-HOME, ANNUAL ENERGY USE BUDGET RATING OF AT
LEAST 60 OUT OF 100.
- THIS APPLIES TO THE ENERGY USE OF THE HOME'S HEATING AND COOLING EQUIPMENT WHICH INCLUDES AIR CONDITIONING, HEATED WATER SYSTEMS, LIGHTING, AND SWIMMING POOL
AND SPA PUMPS.
- THIS APPROACH ENABLES RENEWABLE ENERGY SYSTEMS TO OFFSET THE ENERGY USE BY OR CHOOSING A MORE EFFICIENT HEATING AND COOLING EQUIPMENT TO MEET THE ENERGY
USAGE ALLOWED. IT CANNOT NE USED TO OFFSET ANY REQUIREMENTS OF THE BUILDING (STAR RATING).
(C) TOILET SHEETING AND NOGGINGS: - ADDITIONAL INFORMATION THAT WILL LIKELY NEED TO BE PROVIDED FOR THE WHOLE OF HOME RATING.
(I) SHEETING REQUIREMENTS TO ONE SIDE WALL WHERE THE SIDE
WALL IS WITHIN 460mm OF THE CENTERLINE OF A PAN; HEATING AND COOLING APPLIANCES
OR, - HEATING AND COOLING APPLIANCE TYPES (IDEALLY INCLUDING MODELS AND SIZES)
(II) NOGGING \ SHEETING TO THE REAR OF THE TOILET WHERE WALL - APPLIANCE EFFICIENCIES (WITH METRICS APPROVED TO THE APPLIANCE TYPES)
SHEETING CANNOT BE ACHIEVED. - MARK-UP OF NATHERS CONDITIONED ZONES TO BE SERVICED BY HEATING AND COOLING APPLIANCES (SEVERAL DIFFERENT AREAS IN A HOME MAY BE HEATED \ COOLED, AND
DIFFERENT EQUIPMENT MAY BE SPECIFIED IN EACH OF THESE AREAS) AND WATER SYSTEM.
- HOT WATER SERVICE TYPE (IDEALLY INCLUDING MODEL AND SIZE).
- APPLIANCE EFFICIENCY (WITH METRIC APPROPRIATE TO THE APPLIANCE TYPE) LIGHTING.
- CALCULATED LIGHTING POWER DENSITY (W/m²) COMPLYING WITH SECTION 13.7.6 OF THE ABCB HOUSING PROVISIONS POOL AND SPA PUMPS (IF APPLICABLE).
- POOL DIMENSIONS (EITHER THE TOTAL SURFACE AREA OF THE POOL (m²) OR THE TOTAL VOLUME OF WATER (LITRES) THAT THE POOL IS DESIGNED TO HOLD).
- POOL PUMP MODEL AND TYPE( SINGLE, DOUBLE OR MULTISPEED)
- POOL CLEANER TYPE.
- PUMP EFFICIENCY EXPRESSED AS A START RATING (BASED ON THE ENERGY RATING LABEL COMMENCING 1st OCTOBER 2022) RENEWABLE ENERGY (IF APPLICABLE).
- RATED SIZES (IN KILOWATT - KW) OF PV ARRAYS - IF THERE IS MORE THAN ONE GROUP OF PV PANELS, THEN THE SIZE OF EACH GROUP IS REQUIRED).
- AZIMUTH (ORIENTATION) AND INCLINATION (SLOPE) OF PC ARRAYS - IF THERE IS MORE THAN ONE GROUP OF PV PANELS, THEN THESE DETAILS ARE REQUIRED FOR EACH ARRAY
LOCATION.
- RATED INVERTER SIZE (KW), NUMBER OF PHASES (SINGLE, TWO OR THREE-PHASE) AND EXPORT LIMITS (KW).
- PLEASE NOTE IF ANY OF THE ABOVE INFORMATION IS NOT AVAILABLE, DEFAULTS WILL BE USED AND THIS COULD EFFECT THE COMPLIANCE OUTCOME.
WATER CONSERVATION
- DWELLING CONNECTED TO TOWN WATER MUST HAVE:
(A) DUAL FLUSHING TOILETS WITH MIN. 4 STAR WELS RATING;
(B) CISTERNS WHICH ARE COMPATIBLE WITH THE SIZE OF THE TOILET BOWL TO ALLOW FOR PROPER FUNCTIONING OF THE TOILET.
Project Description
No. Description Date PROPOSED DWELLING HOUSING PROVISIONS
W: www.theshedhouse.com.au A DESIGN ROUND 1 - ISSUE A 07.11.2025
Project number TSH25038
B DESIGN ROUND 2 - ISSUE B 12.11.2025
WD.128
Project Address
C RELEASED FOR APPROVAL 08.12.2025 Date 15.02.2026 28 of 33
ABN: 39 630 500 695 9 RULES ROAD, POMONA QLD 4568
D RELEASED FOR APPROVAL 05.02.2026 Drawn by AG Sheets in Set
QBCC: 1514 0876 E RELEASED FOR APPROVAL 15.02.2026
Client Name Client Checked by TSH TEAM Scale
C_I C_2_I
BARNES Approval Soil Class: TBC Wind Design: TBC
Do not scale off this drawing. All dimesnions to be verified on site. Barnward Construction Services Pty Ltd owns copyright in this drawing. Unauthorised use, reproduction, or any adaptation is forbidden & will be prosecuted.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.