PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 AUGUST 2016
Stormwater Harvesting
40. Operating stormwater harvesting tanks must be provided for the development and must
include re-use of harvested rainwater for internal non-potable uses and outdoor uses.
Damage to Services and Assets
41. Any damage caused to existing services and assets above or below the ground must be
repaired:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
ENVIRONMENTAL HEALTH
Acoustic Report –Design Stage
42. An acoustic report prepared by a suitably qualified person* must be submitted to council that
addresses the noise impacts from plant and equipment etc. on nearby residences and
commercial areas of Wimmers Lane and Garnet Street at the detail design stage prior to
commissioning the equipment. The acoustic report must demonstrate compliance with the
requirements specified in Table 1 of this Decision Notice when measured at either the
residential boundary or outside the most exposed part of an affected building, whichever is
the closest to the equipment. The acoustic report must address the following:
mechanical equipment such as a/c units, motors, refrigeration equipment,
compressors, pumps, rooftop plant and equipment, ventilation, fans, plant rooms,
refuse compactors and pumps etc. and;
the location of any plant and associated equipment,
measured background noise levels
a description of acoustic enclosures and screenings if used
attenuation measures to comply
Noise - Mechanical Plant and Equipment
43. Mechanical plant and equipment, a/c units, motors, refrigeration equipment, compressors,
pumps, rooftop plant and equipment etc. must be situated within the building where possible
or suitably provided with noise reduction measures and located as to prevent a noise
nuisance beyond the boundary of the site and not exceed the levels specified in Table 1 of
this Decision Notice.
TABLE 1
NOISE LIMITS AT A SENSITIVE RECEPTOR
Noise level at noise sensitive place measured as the adjusted
PERIOD
maximum sound pressure level (L10, adj,T)
7am – 6pm Background noise level (L90,T) plus 5 dB(A)
6pm – 10pm Background noise level plus 5 dB(A)
10pm – 7am Background noise level plus 3 dB(A)
Page 53 of 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.