Theme 1 — Environment Key Actions
No. Description Comment % Complete
4 Continued delivery of Community and Ongoing delivery of both grants programs. 40
Environment Grants Program. Community Grants Policy has been reviewed,
revised and adopted. New grant categories to be
implemented from September 2025.
Highlights
Enhance our understanding of the value of our
5 Ongoing. 50
natural areas and systems.
— Noosaville Foreshore Infrastructure Management Plan: The master plan is a 20-year strategy to guide Complete and annual monitoring is ongoing -
6 Develop integrated water monitoring program. 100
sustainable upgrades, improve amenities and accessibility, and enhance climate resilience, while Public dashboard being developed.
preserving the foreshore’s natural character and reflecting community priorities. Complete and implement Encroachments into Complete and implementation is ongoing within
7 100
Public Land Policy. resources.
— The iconic story of surfing in Noosa: A comprehensive record that celebrates and preserves this
distinctive element of the region’s heritage and lifestyle. The work captures historical milestones, notable
personalities, and the cultural significance of surfing in shaping Noosa’s identity.
Operational Plan 2024 – 2025 Performance Progress
— Council Works: Throughout the Operational Plan year, Council ensured that all capital, civil, and
maintenance works adhered to Noosa Design Principles, legislative requirements, and environmental
best practices, including the practical integration of fauna- and flora-sensitive designs to minimise Completed Initiatives
environmental impact. OP Ref Initiative Lead Service Area Status Date Delivered
1.3.1 Finalise the Noosaville Foreshore Management Plan to Infrastructure Services 19/06/2025
Corporate Plan 2023 – 2028 Performance Progress provide an asset renewal program for aging infrastructure
Noosa Council Annual Report 24/25
and in response to increased community expectations and
the increasing risk of climate change.
Signature Projects 1.3.5 Implement the Noosa Spit Shoreline Erosion Management Infrastructure Services 31/08/2024
Plan (SEMP) to protect the Noosa Spit and river estuary (incl.
sand and Noosaville foreshores) from major coastal events.
No. Description Comment % Complete
1.4.1 Prepare Conservation Management Plans for at least two Community Services 26/03/2025
1 Yurol-Ringtail State Forest Conservation Project. Complete. 100 Council-controlled heritage places to inform decision
making about conserving and managing places of cultural
2 Completion of the Noosa River Plan. Funding and a resource secured through Resilient 50 significance.
Rivers Program to deliver the Catchment Action
Plan in 2025 and 2026. 1.4.2 Document the iconic story of surfing in Noosa to capture this Community Services 30/06/2025
unique aspect of Noosa’s heritage and lifestyle.
3 Implementation of Coastal and Foreshore Underway - implementation ongoing within 20
Management Plans. allocated resources.
1.5.1 Finalise the transition arrangements for the Yurol Ringtail Strategy and 01/02/2025
4 Delivery of Coastal Hazard Adaptation Plan Various CHAP projects are underway and being 30 State Forest land for conservation to expand the area Environment
(CHAP). delivered. Further information is available on protected for conservation in Noosa Shire.
Council’s website.
1.8.3 Ensure all Council capital, civil and maintenance works are Infrastructure Services 30/06/2025
Key Actions planned, delivered, and maintained in accordance with the
Noosa Design Principles, legislative requirements, and best
1 Ongoing delivery of Noosa Shire Heritage Ongoing delivery of heritage program and growth 40
environmental practice. This includes minimising impacts on
Program, including Heritage Register, Heritage of heritage portal, stage 3 of heritage register
environmental values and incorporating fauna/flora sensitive
Overlay and Heritage Portal. review complete - awaiting planning amendment
designs into project planning and delivery, where practical.
process, new structure implemented for heritage
services.
2 Refresh, implement and embed the Noosa Design Draft complete. Feedback is being sought 60
Principles. in coming months and final document to be
presented to Council later this year.
3 Delivery of annual Capital Infrastructure Program. Solid delivery of $30million worth of Program 80
consistent with previous years, especially
considering weather and resource constraints.
A budget initiative has been profiled for FY25/26
to better resource the Program to provide more
proactive delivery.
56 57
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.