Council archive · source document
Attachment B - Proposed Plans · MCU19/0049.01
Plans and drawings: the text below has words only, no drawings.
69.2
m
FH-10-002
FH1
m
58
FH2
2
FH
FH2
FH-10-002 FH2 FH2
FH2
FH
2
62
m
FH2
FH2
FH2
57m
MECHANICAL ELECTRICAL HYDRAULIC FIRE ENERGY NABERS STORMWATER SECTION J BEEC
This drawing is not to be used for any construction purpose unless noted Project Drawing Title Discipline Scale 1:200 @ A1
otherwise in the issue column. Marline Newcastle pty ltd. accept no responsibility
EDEN PRIVATE HOSPITAL UPPER FLOOR
for any unauthorised use of drawings issued on a "information and discussion"
only basis. A 13.04.26 FOR CONSTRUCTION ZM CB DW
50 MAPLE STREET, COOROY QUEENSLAND FIRE HYDRANT LAYOUT FIRE HYDRANT SERVICES
N
This drawing is copyright and is the property of Marline Newcastle pty ltd and must
2 27.01.26 REVISED AS REQUESTED ZM CB
not be retained, copied or used without written consent of marline newcastle. Job No. Drawing No. Rev
1 16.12.25 100% ISSUE FOR REVIEW ZM CB
[email protected] www.marline.com.au (02) 4925 9300 0 25mm
50mm 100mm ON A1 ORIGINAL
Rev Date Reason for Issue Drawn Design Verify MN16443 FH-10-003 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment B - Proposed Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 518 KB (small file)
- File type
No other editions are linked here.