PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
40. The certification must be submitted to Council, which certifies that operational noise
from any fixed plant and equipment complies with the requirements of this Decision
Notice.
OPERATIONAL WORKS CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
16-0604-C1 B Civil Works prepared by Lindsay 1 December 2016
Consulting Pty Ltd as annotated by
Council
16-0604-C2 B Civil Works Frontage Works prepared 1 December 2016
by Lindsay Consulting Pty Ltd as
annotated by Council
16-0604-C8 A Landscape Plan prepared by Lindsay 22/09/2016
Consulting
PRIOR TO COMMENCEMENT OF WORKS
Engineering
2. All necessary approvals from external service providers (eg Unitywater) and external
parties on which the development works are proposed have been obtained and a
copy supplied to Council.
3. A condition report of the drainage system must be completed for agreement at the
prestart meeting. The condition report is to include a CCTV inspection of the existing
pipe system in Opal Street extending from nearest surface pit east and west of the
subject site.
4. A condition report including photographs of the frontage of the site must be
completed and submitted to council at the prestart meeting / prior to any works
commencing.
5. Certificates demonstrating currency of public liability insurance and works insurance
covering the works must be submitted to Council at the prestart meeting.
6. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245.
The pre-start meeting must include the relevant parties for the following aspects of
the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties
Page 10 of 91
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.