2017-03-07 Planning & Environment Committee Agenda

of 91

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   7 MARCH 2017


    7.    A Construction Management Plan must be submitted to Council prior to the pre-start
          meeting and must specifically address the following:
          a.   Traffic Management during all aspects of the construct phase including:
               i.     A Traffic Management Control Plan in accordance with Manual of Uniform
                      Traffic Control Devices (MUTCD) detailing all temporary signage and
                      traffic control measures prior to construction
               ii.    Maintenance of safe pedestrian access across the frontage of the site
                      both during daily construction and after daily construction has ceased
               iii.   Proposed fencing to the site during the construction phase of the
                      development
               iv.    Adequate parking arrangements for construction workers
               v.     No queuing of trucks is permitted on residential streets, especially prior to
                      7.00am. Further parked trucks must have engines turned off
          b.   Maintenance and protection of water quality and existing drainage lines through
               the construction site through the implementation of appropriate erosion and
               sediment control measures
          c.   Works programme identifying key components of the works and their respective
               durations
          d.   Establishment of a communication protocol with the general public, adjoining
               owners, emergency services and local businesses to advise of agreed
               construction times, impacts on traffic and services and other relevant issues
          e.   identification of complaint management procedures including:
               i.     contact details for the on-site manager
               ii.    dispute resolution procedures
    8.    Any changes to the details associated with the supervising RPEQ or Principal
          Contractor during construction, must be notified to council in writing within five
          business days of the change occurring.
    9.    Any conflict between the development and an existing or proposed service must be
          referred to the relevant service authority for determination prior to commencement of
          works.
          DURING CONSTRUCTION
          Engineering
    10.   The developer must meet any costs to repair damage to any Council asset during
          construction, where damage is a result of the development works. Damage to assets
          must be repaired immediately where it creates a hazard to the community. In
          circumstances where the damage does not create a hazard to the community, it must
          be repaired immediately on completion of the works associated with the
          development.
    11.   All works must be supervised by a Registered Professional Engineer of Queensland
          (RPEQ) who is independent of the Developer and Principal Contractor, and they must
          certify that all works conform to the Operational Works permit. Where municipal
          works are involved, such confirmation must be submitted for the respective hold
          points prior to any site inspection by Council Officers.




                                                                                    Page 11 of 91
Log in to download the original file

2017-03-07 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.