12. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice
b. The relevant conditions of the higher order Material Change of Use approval
c. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines
d. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site
Road works (External Road works & Road Widening Works)
13. All pavement widening or construction of new pavement must join neatly to the
existing pavement so that there are no irregularities in line or level resulting at or
adjacent to the join for the length of the construction. Where necessary the existing
pavement must be brought to a satisfactory standard to allow for the above.
14. All street surfacing must consist of a minimum depth of 30mm of an approved hot
mixed asphaltic concrete.
Pavement Design and Construction
15. The pavement design shown on the engineering drawings are not approved. The final
pavement design must be agreed on-site with Council’s Engineering Officer.
16. Pavement design for privately owned works must be undertaken in accordance with
the relevant standards. Structural integrity of the driveway and car park areas will
remain the responsibility of the property owner/developer and must be certified by an
RPEQ.
Works within Road Reserve/Reinstatement
17. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
18. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable
transition to existing road and verge/footpath profiles.
19. Electrical conduits or other services proposed to be installed within existing and
proposed road reserves under existing sealed carriageways, concrete pathways,
concrete/sealed driveways or significant vegetation must be installed by boring.
Trenching is not permitted, unless specifically approved by Council.
Pathways
20. All pathways must be constructed in accordance with the following requirements:
a. All footpath/cycleway must comply with Council’s Standard Drawing RS-065.
b. All paths must have a slip resistant surface
c. Expansion and contraction joints must provide a flush finish. Installation of joints
by saw cutting is preferred to ensure a smooth ride for cyclists
d. The required work includes any modifications to ensure the footpath finishes
flush with all existing service covers and the like, or alternatively these services
are raised or altered, so as not to create a pedestrian safety hazard
Page 12 of 91
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.