PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
21. Pathways must:
a. terminate in a manner that ensures smooth transition to existing surfaces for
public safety
b. be designed and constructed to comply with the Disability Discrimination Act
(DDA), Access to Premises Standard, Austroads and relevant sections of
AS1428 Design for access and mobility
Site Access and Driveways
22. Driveway crossovers must be constructed in accordance with Council’s Standard
Drawing RS-051
23. Any existing unnecessary or redundant property accesses must be removed, and the
kerb, footpath and verge area reinstated to match the existing footpath and/or verge
treatments. Grassed verge areas to be reinstated must be provided with 100 mm
topsoil and grass seed or turf, and must be maintained by the developer until
established.
24. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway surfacing must consist of either an approved hot mixed asphaltic
concrete or patterned/plain concrete.
b. The driveway must be constructed so as not to concentrate stormwater runoff
onto neighbouring properties
c. Underground service conduits for water supply, electricity and any other
services must be provided as part of the access driveway
d. Where there is an existing pedestrian path, a matching crossfall must be
provided for the driveway on the alignment of the path, for the full width of the
path
Earthworks
25. All earthworks shall be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development.
Stormwater Drainage
26. Appropriate scour protection must be provided at the outlet of all stormwater pipes
including temporary outlets.
27. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (eg by blocking or interfering with natural overland
flows).
28. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Environment
29. Prescribed Water Contaminants (as defined in the Environmental Protection Act
1994) must not be released from the site or to waters within the site, or be likely to be
released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination.
30. Erosion and sediment control measures must be installed and maintained to minimise
erosion on the site and to minimise the export of sediment and associated pollutants
from the site. The erosion and sediment control measures must be designed,
installed and maintained in accordance with current best practice standards (refer to
advisory notes).
Page 13 of 91
See the original
The page text is free to read. Viewing or downloading an original file needs an account.