Original source · versioned page text
2017-03-07 Planning & Environment Committee Agenda
The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Damage to Services and Assets
25. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Waste Storage
26. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties.
27. A bin wash area is required with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water
entry to the sewerage system which can be achieved by a bunded area, with a nib
wall height of 100mm maximum, enclosing a wash area of 700mm x 700mm
minimum (max 0.7m²). Alternatively the waste area can be roofed or any other
appropriate design approved by Council.
Landscaping
28. An amended landscaping plan must be submitted to Council for endorsement prior
the issue of a Development Permit for Building Works. The amended plan must
include in particular:
a. the works shown on the Approved Plans including a 2 metre wide planting bed
of native species suitable from screening the development to the Opal Street
and Diamond Lane frontage exclusive of the access driveway, generally
uncompromised by infrastructure items;
b. details of front boundary fencing along Diamond Lane and Opal Street;
c. Screening vegetation to the side boundary setback areas uncompromised by
infrastructure;
d. Species in accordance with Planning Scheme Policy 3 Landscape Plants and
Guidelines; and
e. Plans prepared by a landscape architect, landscape designer and/or
horticulturist with a minimum of 3 years current experience in the field of
landscape design.
29. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
30. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
Front Boundary Fencing
31. Front fences or walls must be setback an average of 1 metre and are articulated to
provide visual interest by stepping the design at maximum 5m intervals. The area of
land between the fence and the front property boundary shall be densely landscaped
to screen any fencing from the street.
Page 7 of 91
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.