PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 MARCH 2017
Asbestos removal control plan
32. A Queensland licensed asbestos removalist (Class A and/or Class B) must submit to
council’s Environmental Health unit an Asbestos Removal Control Plan (ARCP) for
any structures that contain asbestos containing materials (ACM) prior to relocation of
the houses to the site. The asbestos removal control plan may incorporate the Safe
Work Method Statement (SWMS) and must include:
a. Details of the asbestos removalist and copy of licence(s)
b. Details of how the asbestos removal will be carried out including dates and
methods ( e.g. tools, equipment and personal protective equipment, monitoring
etc to be used etc)
c. Details of the asbestos to be removed, including location, type and condition of
the asbestos
d. Details of the treatment, transport, quantity, tracking (if more than 250kg) and
final disposal of asbestos waste
33. An independent competent person (as defined by the Work Health Safety Regulation)
must carry out a clearance inspection for any asbestos removal work conducted (i.e.
Class A & Class B) and submit to council’s Environmental Health unit a Clearance
Certificate prior to reconstruction or occupation of the houses.
Building Demolition/Removal/Relocation
34. Where the development involves the removal, relocation or demolition of a building, a
Waste Management Plan (construction and demolition) shall be submitted and
approved by Council’s Environmental Health Officer prior to issue of a development
permit for operational works for demolition, removal or relocation of any building other
than a shed.
The purpose of the Waste Management Plan is to facilitate the segregation of waste
for the effective reuse and recycling of such materials. Segregated wastes attract
significantly reduced disposal fees at the landfill with some items free. Higher gate
fees are charged for mixed waste.
Waste Management Plans (construction and demolition) are required to be submitted
in accordance with Planning Scheme Policy 11, Waste Management Plans.
Waste storage areas are to provide for adequate separation of all reusable,
recyclable and waste materials. These shall be located so that they are convenient
and safe to use.
The Plan shall contain the following information:
a. The site area for the storage and separation of waste is to be shown on the
plan drawings accompanying the application.
b. A waste management table as indicated below is to be completed showing how
waste material is to be segregated - recycled – reused or disposed.
Page 8 of 91
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.