2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
(a) they are contained within the prolongation of the boundaries Visual amenity will not be
prolongation of boundaries of (Refer Figure 9.4.9.3A). impacted given the Project is
the lot; predominantly on seabed/rocky
(b) that when a vessel is berthed it AO9.2 intertidal areas.
does not encroach over the For lots with waterway frontage of The most likely area of conflict
prolongation of boundaries of less than 15 metres in width between the Project and
the lot; (including lots located in waterway existing uses is at the proposed
(c) a high level of visual amenity is bends or at the head of the load-out facility at Noosaville.
maintained when viewed from waterway)—
the waterway and adjoining (a) a joint application is made Potential conflicts with uses in
lands; with the adjoining owner; or the water and foreshore will be
(d) they avoid conflicts with uses (b) where a joint application is short-term and minimised by
in the water and on the not possible, jetties and appropriate configuration of the
foreshore and adjoining lands; pontoons— proposed load-out site at
(e) cluttering of waterways is (i) are setback a minimum of 1 Noosaville. The load-out site is
avoided; metre from the prolongation configured in two sections
(f) public access to beaches and of the boundaries; leaving sufficient space for
foreshores is not impeded, (ii) are not more than 1.2 recreational boaters and
including the pocket sandy metres in width; and commercial companies to
beaches and other foreshores (iii) have no head and are access the shoreline
along the Noosa River; located such that when a
(g) excessive traffic volumes vessel is berthed it does not The works must be undertaken
within foreshore areas and encroach over the in accordance with an approved
adjoining lands are avoided; prolongation of a boundary Construction Environmental
(h) materials blend with the (Refer Figure 9.4.9.3B). Management Plan (CEMP) as
natural surrounds; and per Council approval conditions.
(i) they reflect the character and AO9.3
setting of the immediate For lots that adjoin those described
surrounds of the locality. in AO9.2, a jetty or pontoon is
located well away from the common
boundary.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.