Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PO10                                    No acceptable outcome provided.        The applicant has not specifically    The Project does not include
Jetties and wharves are not roofed.                                            addressed the Waterways works         jetties or wharves therefore
                                                                               code.                                 PO10 is not applicable.
PO11                                      No acceptable outcome provided.      The applicant has not specifically    The Project does not include
Boat lifting devices (including boat                                           addressed the Waterways works         boat lifting devices therefore
storage devices) are only located to                                           code.                                 PO11 is not applicable.
services properties on Noosa North
Shore.
PO12                                      No acceptable outcome provided.        The applicant has not specifically  The Project does not include
Large jetties, pontoons and wharves                                              addressed the Waterways works       jetties, pontoons or wharves
that are capable of serving other uses,                                          code.                               therefore PO12 is not
such as for private recreational                                                                                     applicable.
purposes, are not developed.
Design, Construction and Safety for jetties, wharves and pontoons - prescribed tidal works outside Noosa Waters Estate
PO13                                      AO13.1                                 The applicant has not specifically  The Project does not include
Prescribed tidal works are designed       The maximum width of a jetty, jetty    addressed the Waterways works       jetties, wharves or pontoons
and constructed for the sole purpose of head or associated walkway is 1.5        code.                               therefore PO13 is not
providing access to vessels and are       metres, except on Noosa North                                              applicable.
sited and designed to avoid—              Shore.
    (a) cluttering of waterways;
    (b) excessive traffic volumes         AO13.2
         within foreshore areas and       For jetties on Noosa North Shore,
         adjoining lands;                 the maximum width of the jetty
    (c) conflicts with uses on the        head is 2 metres.
         foreshore and adjoining lands;
         and                              AO13.3
    (d) unacceptable risks to personal The maximum length of a jetty head
         and public safety.               is not more than 7 metres.

                                        AO13.4
                                        A pontoon head has a maximum
                                        width of 3 metres and a maximum
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.