Skip to the record
Search everything, all in one place.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                  Acceptable outcome                   Applicant response          Assessment
to the following—                                                         shell as detailed in ICM    works include locally sourced
(a) the natural features of the                                           drawing SROR-2021-02.       ‘materials’ (rock, oyster shell) from
works’ immediate                                                          a) The materials are        the Noosa River.
surroundings and the                                                      consistent with natural
locality within which the                                                 rocky rubble reefs which
works are located;                                                        are present within some
(b) the existing buildings or                                             area of the Restoration
other structures in the                                                   Zones.
works’ immediate                                                          b) The materials are
surroundings and the                                                      consistent with rock
locality within which the                                                 erosion protection
works are located;                                                        structures located
(c) if the relevant planning                                              throughout the Noosa
scheme states the desired                                                 River.
materials to be used for, or
desired colours of,
buildings or other
structures in the works’
immediate surroundings or
the locality within which
the works are located—the
stated desired materials or
colours
Lighting
5.1 Lighting, other than an aid to   The lighting for the prescribed      Complies with Performance The applicant has demonstrated
navigation, for prescribed tidal     tidal works, other than an aid to    Outcome 5.1                  compliance with PO5.1 given that no
works is installed in a way to       navigation, is consistent with the   The works are oyster         lighting is proposed.
ensure the security and safe use     following standards—                 habitat and will not be lit.
of the works without causing         (a) subject to paragraph (c),
significant adverse effects on the   lighting for prescribed tidal
amenity of the locality within       works is hooded and directed
which the works are located.         downwards;
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.