Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                 Acceptable outcome                    Applicant response            Assessment
                                    (b) subject to paragraph (c), each
                                    lighting standard, to the
                                    extent relevant;
                                    (c) if a relevant planning scheme
                                    standard is more stringent
                                    than the standard mentioned
                                    in paragraph (a) or (b)—the
                                    relevant planning scheme
                                    standard, to the extent the
                                    standard is more stringent
                                    than the standard mentioned
                                    in paragraph (a) or (b);
                                    (d) any other relevant planning
                                    scheme standard that is not
                                    inconsistent with the
                                    standards mentioned in
                                    paragraphs (a), (b) and (c).
Signage
6.1 A sign erected or otherwise     A sign erected or otherwise placed    Complies with Performance     The applicant has demonstrated
placed in position for prescribed   in position for prescribed tidal      Outcome 6.1                   compliance with PO6.1. The
tidal works, other than a sign      works, other than a sign erected or   Signage and aids to           proposed signage is consistent with
erected or placed for safety        placed for safety reasons or under    navigation are to be          the acceptable outcomes.
reasons or under an Act—            an Act, is consistent with the        installed as required by
(a) is compatible with the          following standards—                  MSQ permit conditions.
character and amenity of            (a) subject to paragraph (c), a       Section 7 of the Project
the works’ immediate                sign erected or placed in             Restoration Plan outlines
surroundings and the                position for identifying              navigation aid type,
locality within which the           prescribed tidal works, or the        signage specifications and
works are located; and              owner of the works, is the            signage certification. This
(b) is not a dominant feature of    only sign erected or placed in        selection has been
the works, unless the               position for identifying the          informed by pre-
dominance is for safety             works or owner;
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.