Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                    Acceptable outcome                     Applicant response              Assessment
surroundings; or
(ii) the level of the surface
of the land under the
tidal water in the
works’ immediate
surroundings or any
foreshore near the
works.
7.2 The location and construction of   Vegetation on land affected by the     Complies with Performance       The applicant has demonstrated
prescribed tidal works ensures         prescribed tidal works is dealt with   Outcome 7.2                     compliance with PO7.2 by avoiding
vegetation is cleared or               in a way consistent with the           The works only allow minor      direct disturbance to terrestrial or
disturbed only to the extent           following standards—                   temporary impacts to            intertidal vegetation at all
reasonably necessary for the           (a) subject to paragraph (b), the      terrestrial vegetation at the   restoration sites.
works.                                 clearing or disturbance of             Tewantin site (Refer ICM
                                       vegetation for a purpose               Drawing NROR-2021-04).
                                       associated with the                    While avoidance of this
                                       construction of prescribed             impact is possible, it is
                                       tidal works, including, for            anticipated the works will
                                       example, parking for                   provide considerable
                                       construction or workers’               enhancement to the
                                       vehicles or stockpiling of             existing degraded habitat
                                       construction materials—                in this location. The impact
                                       (i) is avoided; or                     of the works is limited to
                                       (ii) if the clearing or                the footprint of the
                                       disturbance of                         individual reef patches,
                                       vegetation for a purpose               such that the works will
                                       associated with the                    retain any marine plants
                                       construction of the                    present in access gaps
                                       works can not be                       between reef patches.
                                       avoided—the clearing or
                                       disturbance is limited to
                                       the smallest area of land
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.