2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                Acceptable outcome                     Applicant response             Assessment
                                   reasonably necessary for
                                   the purpose;
                                   (b) any other relevant planning
                                   scheme standard that is not
                                   inconsistent with the standard
                                   mentioned in paragraph (a).
7.3 After the construction of      Land or vegetation affected by the     Complies with Performance      The applicant has demonstrated
prescribed tidal works, any land   prescribed tidal works is dealt with   Outcome 7.3                    compliance with PO7.3 by avoiding
damaged or destabilised by, and    in a way consistent with the           The works only allow minor     direct disturbance to terrestrial or
any vegetation damaged,            following standards—                   temporary impacts to the       intertidal vegetation at all
destroyed or removed by, the       (a) subject to paragraph (b)—          significantly degraded         restoration sites.
construction of the works is       (i) land surfaces damaged              seabed habitat at the
rehabilitated.                     or destabilised by the                 Tewantin site (Refer ICM       Seabed impacted as a result of the
                                   prescribed tidal works                 Drawing NROR-2021-04).         works will ultimately be rehabilitated
                                   are restored and                       The site will be extensively   as part of the works as detailed in
                                   stabilised; and                        habilitated with rocky         ICM Drawing NROR-2021-04.
                                   (ii) vegetation damaged,               substrate and oyster cultch
                                   destroyed or removed by                as part of the proposed
                                   prescribed tidal works is              works. For detail, refer ICM
                                   replaced with native                   drawings and Project
                                   vegetation for the                     Restoration Plan.
                                   locality within which the
                                   works are located, to the
                                   extent it is reasonably
                                   practicable to replace
                                   the vegetation with
                                   native vegetation;
                                   (b) if a relevant planning scheme
                                   standard is more stringent
                                   than the standard mentioned
                                   in paragraph (a)—the
                                   relevant planning scheme
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.