Performance outcome Acceptable outcome Applicant response Assessment
reasonably necessary for
the purpose;
(b) any other relevant planning
scheme standard that is not
inconsistent with the standard
mentioned in paragraph (a).
7.3 After the construction of Land or vegetation affected by the Complies with Performance The applicant has demonstrated
prescribed tidal works, any land prescribed tidal works is dealt with Outcome 7.3 compliance with PO7.3 by avoiding
damaged or destabilised by, and in a way consistent with the The works only allow minor direct disturbance to terrestrial or
any vegetation damaged, following standards— temporary impacts to the intertidal vegetation at all
destroyed or removed by, the (a) subject to paragraph (b)— significantly degraded restoration sites.
construction of the works is (i) land surfaces damaged seabed habitat at the
rehabilitated. or destabilised by the Tewantin site (Refer ICM Seabed impacted as a result of the
prescribed tidal works Drawing NROR-2021-04). works will ultimately be rehabilitated
are restored and The site will be extensively as part of the works as detailed in
stabilised; and habilitated with rocky ICM Drawing NROR-2021-04.
(ii) vegetation damaged, substrate and oyster cultch
destroyed or removed by as part of the proposed
prescribed tidal works is works. For detail, refer ICM
replaced with native drawings and Project
vegetation for the Restoration Plan.
locality within which the
works are located, to the
extent it is reasonably
practicable to replace
the vegetation with
native vegetation;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.