Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
loading matters for the design
or construction of the
prescribed deck—
(i) AS/NZS 1170.0;
(ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS 4997;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
15.2 Prescribed tidal works that are a (s 5(2) outcome) Not applicable. The Project is not a prescribed deck
prescribed deck and for a The design or construction of the Not a deck. therefore PO15.2 is not applicable.
non-private purpose are prescribed deck is consistent with
designed and constructed in a the following standards-
way to ensure the deck is able to (a) subject to paragraph (b), each
support its intended loads, of the following Australian
having regard to its relevant Standards to the extent
loading matters. requirements stated in the
Standard apply to relevant
loading matters for the design
or construction of a
prescribed deck—
(i) AS/NZS 1170.0;
(ii) AS/NZS 1170.1;
(iii) AS/NZS 1170.2;
(iv) AS 1170.4;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.