2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                      Acceptable outcome                   Applicant response   Assessment
                                         (v) AS 4997;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
                                         standard mentioned in
                                         paragraph (a).
15.3 Prescribed tidal works that are a   The design and construction of the   Not applicable.      The Project is not a prescribed deck
prescribed deck do not prevent           prescribed deck is consistent with   Not a deck.          therefore PO15.3 is not applicable.
or hinder remedial work being            the following standards—
undertaken on any bank of tidal          (a) subject to paragraph (b), a
water or for any existing                prescribed deck either—
revetment or seawall or another          (i) can be easily dismantled
existing structure.                      and reassembled; or
                                         (ii) does not restrict the
                                         movement of machinery
                                         ordinarily used for
                                         remedial work to any
                                         bank of tidal water or
                                         any existing revetment
                                         or seawall or other
                                         existing structure;
                                         (b) if a relevant planning scheme
                                         standard is more stringent
                                         than the standard mentioned
                                         in paragraph (a)—the
                                         relevant planning scheme
                                         standard, to the extent it is
                                         more stringent than the
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.