2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                       Acceptable outcome                     Applicant response     Assessment
                                          standard mentioned in
                                          paragraph (a).
Design, construction and safety—jetties and piers
16.1 Prescribed tidal works that are a    (s 5(2) outcome)                       Not applicable.        The Project is not a jetty or pier
jetty or pier are designed and            The design and construction of the     Not a jetty or pier.   therefore PO16.1 is not applicable.
constructed in a way to ensure            jetty or pier is consistent with the
the jetty or pier is able to support      following standards-
its intended loads, having regard         (a) subject to paragraph (b), each
to its relevant loading matters.          of the following Australian
                                          Standards to the extent
                                          requirements stated in the
                                          Standard apply to relevant
                                          loading matters for the design
                                          or construction of the jetty or
                                          pier—
                                          (i) AS/NZS 1170.0;
                                          (ii) AS/NZS 1170.1;
                                          (iii) AS/NZS 1170.2;
                                          (iv) AS 1170.4;
                                          (v) AS 4997;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
16.2 Prescribed tidal works that are a    The design and construction of the                            The Project is not a jetty or pier
jetty or a pier are designed and          jetty or pier is consistent with the                          therefore PO16.2 is not applicable.
constructed in a way to ensure            following standards—
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.