Performance outcome Acceptable outcome Applicant response Assessment
the jetty or pier remains above (a) subject to paragraph (b),
the water at highest either—
astronomical tide. (i) the level of the deck of
the jetty or pier is at
least 300mm above the
water at highest
astronomical tide; or
(ii) piles or other markers
indicate the presence of
the jetty or pier when the
jetty or pier is less than
300mm above the water
at highest astronomical
tide;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
16.3 Prescribed tidal works that are a (s 5(2) outcome) Not applicable. The Project is not a jetty or pier
jetty or pier and for a private The design and construction of the Not a jetty or pier. therefore PO16.3 is not applicable.
purpose and are on State tidal jetty or pier is consistent with the
land are designed and following standards—
constructed in a way to ensure (a) subject to paragraph (b)—
the jetty or pier is of a size (i) all parts of the deck of
suitable for the use of a vessel the jetty or pier have a
while still minimising the width of at least 900mm
amount of tidal water occupied and not more than 3m;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.