Skip to the record
Every meeting, every word.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Performance outcome                       Acceptable outcome                   Applicant response          Assessment
by the jetty or pier.                     and
                                          (ii) all parts of the jetty or
                                          pier are within a water
                                          allocation area for the
                                          lot connected to the jetty
                                          or pier;
                                          (b) if a relevant planning scheme
                                          standard is more stringent
                                          than the standard mentioned
                                          in paragraph (a)—the
                                          relevant planning scheme
                                          standard, to the extent it is
                                          more stringent than the
                                          standard mentioned in
                                          paragraph (a).
Design, construction and safety—pipelines and other underground services
17.1 The design and construction of       s 5(2) outcome)                      Not applicable.             The Project is not a pipeline or
prescribed tidal works that are a         The design and construction of the   Not underground services.   underground service therefore
pipeline or another underground           pipeline or underground service is                               PO17.1 is not applicable.
service ensures vessels                   consistent with the following
anchoring near the works can              standards—
not interfere with, or damage,            (a) subject to paragraph (b)—
the works.                                (i) for a pipeline that is gas
                                          or liquid petroleum
                                          pipeline—AS/NZS 2885
                                          to the extent
                                          requirements stated in
                                          the Standard apply to the
                                          design or construction of
                                          the pipeline; or
                                          (ii) for another pipeline or
                                          other underground
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.