Performance outcome Acceptable outcome Applicant response Assessment
by the jetty or pier. and
(ii) all parts of the jetty or
pier are within a water
allocation area for the
lot connected to the jetty
or pier;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
Design, construction and safety—pipelines and other underground services
17.1 The design and construction of s 5(2) outcome) Not applicable. The Project is not a pipeline or
prescribed tidal works that are a The design and construction of the Not underground services. underground service therefore
pipeline or another underground pipeline or underground service is PO17.1 is not applicable.
service ensures vessels consistent with the following
anchoring near the works can standards—
not interfere with, or damage, (a) subject to paragraph (b)—
the works. (i) for a pipeline that is gas
or liquid petroleum
pipeline—AS/NZS 2885
to the extent
requirements stated in
the Standard apply to the
design or construction of
the pipeline; or
(ii) for another pipeline or
other underground
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.