Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 1 - Report from Marine Approval Specialists
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Performance outcome Acceptable outcome Applicant response Assessment
with the water over
which it is
constructed at all
times and tilts no
more than 15º at
any time;
(b) if a relevant planning scheme
standard is more stringent
than the standard mentioned
in paragraph (a)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a).
18.4 Prescribed tidal works that are a The design and construction of the Not applicable. The Project is not a pontoon
pontoon are designed and pontoon is consistent with the Not a pontoon. therefore PO18.4 is not applicable.
constructed in a way to ensure following standards—
the pontoon’s flotation unit (a) subject to paragraph (c), the
will— pontoon’s flotation unit is—
(a) rise and fall to allow for a (i) attached, through the
change in tidal water levels, pontoon’s system for
including a change caused mooring the unit, to
by a flood or storm tide; concrete anchors in the
and bank landward of the
(b) not be separated from the pontoon; or
lot to which the pontoon is (ii) moored by piles;
connected because of— (b) subject to paragraph (c), if a
(i) a change in tidal water tidal water level change
levels mentioned in resulting from a flood or
paragraph (a); or storm tide with an AEP of 1%
(ii) the flow of tidal water would cause a pontoon’s
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.