Council archive · source document
SPA Decision Notice - 010.2010.00000627.001 [As Published] · 152010.627
2010/627
8.10 protection from wildfire, particularly during the establishment phase;
8.11 erosion and sediment control;
8.12 on-going maintenance;
8.13 access for maintenance;
8.14 environmental safeguards; and
8.15 incorporation of the relevant requirements of all the management plans required by this
approval, particularly the Bushfire Management Plan and Koala Management Plan.
9. All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest and
Stock Route Management) Act 2002 must be controlled on the entire site prior to Council
endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2
pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they
threaten environmentally significant areas of the site such as riparian zones and areas of
natural vegetation.
10. A wire fauna fence shall be erected around the perimeter of the park areas to be protected
and restored, prior to construction activities commencing on site. The fauna fence will have
signs attached restricting entry to authorised persons only.
11. The contract for the Ecological Restoration work shall specify a 1 year maintenance period
from the date restoration works are completed by the contractor to the reasonable satisfaction
of the Council’s Coordinator of Environment and Landscaping, by which time the ecologically
restored areas should be self-sustaining. It shall also be weed-free to the satisfaction of the
Manager, Council’s Coordinator of Environment and Landscaping. The applicant must provide
Council’s Coordinator of Environment and Landscaping with a certification from a suitably
qualified person confirming that management of weeds within the park area complies with the
requirements of the Land Protection and Stock Route Management Act.
12. All the relevant ecological restoration works and actions shall be undertaken by the Developer
and completed prior to dedication of the park areas to Council.
Easements
13. The applicant shall create a volumetric easement for access purposes over Lot 1, in favour of
Lot 2 for vehicular access and car parking purposes.
Power Supply
14. An electricity service shall be provided to Lots 1 and 2.
15. In this regard, an approved ENERGEX Electrical Design Consultant shall be engaged to
prepare detailed designs of the electrical proposal.
16. The detailed designs shall then be submitted to ENERGEX for approval and a copy of their
approval submitted to SCRC in conjunction with a “Certificate of Electricity Supply for
Proposed Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant)
prior to SCRC endorsing the Plan of Survey.
17. Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
purchasers of the proposed lots.
Telecommunications
18. The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
provision of new telephone services to Lots 1 and 2. In this regard written confirmation from
an approved telecommunication agency shall be submitted to the Council prior to Council
endorsing the Plan of Survey.
Landscaping
19. Existing trees on the site and within the road reserve are to be retained, except where required
to be removed due to building operations or conduct the approved use.
Page 3 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice - 010.2010.00000627.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 383 KB (small file)
- File type
No other editions are linked here.