Development Assessment Report
Specific Outcomes Probable Solutions Proposal
Site facilities
O32 Waste storage areas, external 32.1 Waste storage areas, external Complies
storage areas and loading docks do not storage areas and loading docks are The waste storage area is screened.
detract from the visual amenity of the situated to the rear of the building or
streetscape or cause nuisance to under the ground;
adjoining properties. OR
S32.2 With the exception of the access
way, waste storage areas, external
storage areas and loading docks are
visually screened by landscaping or
fencing.
Environment & heritage values No solution provided Complies
O33 There are no significant adverse The site does not contain any
effects on the biodiversity, natural environmental values and no impact on
vegetation, native wildlife, habitats, environmental values will result.
landscape quality, water quality or
heritage values, including those related Refer attached Heritage Impact
to— Assessment which confirms the
a) changes to natural drainage; proposal will not have any heritage
b) disturbance to any of the wetland impacts.
systems;
c) management of landslide and fire
risk;
d) erosion and the transport of
sediments off-site;
e) unmanaged public access;
f) effluent disposal;
g) changes to fauna habitat and
behaviour; and
h) disturbance of buildings and features,
including natural features, of heritage
significance.
COMMUNITY USES CODE
Table 14-17 For all Community uses
Specific Outcomes Probable Solutions Proposal
14.31 Effects of use
Electricity infrastructure S1.1 No solution provided Complies
O1 The development does not The proposal does not adversely impact
adversely impact on existing or future on existing or future electricity supply
electricity supply infrastructure; infrastructure
AND
O2 All uses and works maintain an S2.1 Development for uses adjacent to Not applicable
adequate safe distance from electrical or within 50m of an existing electricity The site is not adjacent to or within 50m
infrastructure including substations, substation incorporates noise of an electricity substation.
overhead powerlines, power poles and attenuation measures to mitigate noise
transformers. impacts;
AND
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Development Assessment Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.