Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208
Access Options Assessment
Noosa on Weyba
Criteria Description Score Justification
is inversely related to the length of fauna underpass enabling native wildlife to
roadway that is established and move with relative safety between habitat
operated through areas of high value located to the east and west of Walter Hay
bushland (e.g. remnant vegetation Drive
and Koala Bushland habitat). Habitat fragmentation associated with
Option 4A would be less than that
associated with all other options.
There is a relationship between Relative to all other options, a greater
traffic volumes and velocities and the proportion of the traffic generated by the
likelihood that wildlife mortality (and Noosa on Weyba development would be
morbidity). The rating of each option directed onto Walter Hay Drive. Existing
is inversely related to: fauna exclusion (guide) fencing along Walter
Road Mortality the capacity to maintain low 4 Hay Drive is to be completed as part of the
vehicular speeds (i.e. < 50 kph) Noosa on Weyba project.
through road geometry and There would be an increased risk of native
passive engineering design; and fauna coming into conflict with traffic using
the volume of traffic on the the Walter Hay Drive underpass, in
roadway. comparison to Option 4.
Average Score 3.7
11.3 Civil Engineering
Table 11-3 Option 4A Assessment – Civil Engineering
Criteria Description Score Justification
Providing a tunnel access under Walter Hay
The economic cost of the roadworks
Drive for the required vehicles will require
and associated infrastructure.
Cost 1 major upgrading of the existing structure.
Highest cost will equal the lowest
This will be a high proportionate cost
number.
compared to other roadworks for the site.
The effect of the road on the Providing access under Walter Hay Drive
Stormwater stormwater and flooding aspects of 5 will not affect the stormwater and flooding
the site issues for this option.
Average Score 3.0
11.4 Overall Score
Considering the transport, ecological and civil engineering aspects of this access option, Option 4A has an
overall score of 9.1.
510119 13 September 2013 Cardno 13 September 2013
Prepared for Northbrook Corporation Pty Ltd Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 14- Amended Traffic Impact Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 7.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.