Original source · versioned page text
8. Appendix E - Previous Approval
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
42. 43. 45. registered against the title of the property. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Earthworks and Retaining Walls All fill and associated batters must be must be undertaken in accordance with an Operational Works approval, and contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. Damage to Services and Assets Any damage caused to existing services and assets above or below the ground must be repaired: (a) where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or (b) where otherwise, upon completion of the works associated with the development. (c) Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. UNITYWATER 46. 47. 48. 49. 50. 51. 52. 53. 54. Water and Sewerage The fire-fighting demand on Unitywater’s water supply system from the development must not exceed 30 litres per second. A single Unitywater installed primary water meter must be provided immediately inside the property boundary. Additional water meters must be installed for each title of a community title or sub-lease scheme. Meters must be Unitywater approved, installed in accordance with Unitywater standards and requirements and remain accessible at all times for reading and maintenance purposes. Water meters must be located on alternative boundaries to electrical pillars. Buildings and other structures must maintain a minimum clearance of 1.5 metres from Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and inspection openings. The applicant must adjust the level of the existing sewerage inspection opening as necessary to suit the proposed finished levels. Work must be undertaken by Unitywater at the owner’s cost. Where the existing sewerage inspection opening point is located within a sealed or concreted area, a brass cap is required to be fitted. Storm water retention systems and gross pollutant traps must maintain a minimum clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure. Redundant sewer pipes within the development site must be removed or slurry filled. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within these clearances must be low growing when mature and suitable approved varieties. Construction works undertaken in the vicinity of Unitywater water supply or sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.