8. Appendix E - Previous Approval

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

42.
43.

45.

registered against the title of the property. All easements must be designed in
accordance with the planning scheme and granted at no cost to the Grantee. Where the
Grantee is Council or a service authority, the easement documentation must be in
accordance with the Grantee’s standard easement terms.

Draft easement documentation must be submitted to Council for endorsement.

All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.

Earthworks and Retaining Walls

All fill and associated batters must be must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.

Damage to Services and Assets

Any damage caused to existing services and assets above or below the ground must be
repaired:

(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or

(b) where otherwise, upon completion of the works associated with the development.

(c) Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.

UNITYWATER

46.

47.

48.
49.

50.

51.

52.

53.

54.

Water and Sewerage

The fire-fighting demand on Unitywater’s water supply system from the development must
not exceed 30 litres per second.

A single Unitywater installed primary water meter must be provided immediately inside
the property boundary. Additional water meters must be installed for each title of a
community title or sub-lease scheme. Meters must be Unitywater approved, installed in
accordance with Unitywater standards and requirements and remain accessible at all
times for reading and maintenance purposes.

Water meters must be located on alternative boundaries to electrical pillars.

Buildings and other structures must maintain a minimum clearance of 1.5 metres from
Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and inspection
openings.

The applicant must adjust the level of the existing sewerage inspection opening as
necessary to suit the proposed finished levels. Work must be undertaken by Unitywater
at the owner’s cost. Where the existing sewerage inspection opening point is located
within a sealed or concreted area, a brass cap is required to be fitted.

Storm water retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.

Redundant sewer pipes within the development site must be removed or slurry filled.

Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature and suitable approved
varieties.

Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs

 

Page 8
Log in to download the original file

8. Appendix E - Previous Approval.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.