Skip to the record
Beware of cheap imitations.

Original source · versioned page text

8. Appendix E - Previous Approval

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

associated with repair, replacement or alteration of infrastructure must be met by the applicant.

 

| 5. REFERRAL AGENCIES

 

    

  

 

 

 

 

 

The referral encies applicable to this application are:
jerrall es en ae ieee
Concurrence | Department Of State Controlled The agency provided its
Transport & Main Road, response on 13 November
Roads : 2012. A copy of the
cae response is attached.
Railways
Concurrence | Department Of Contaminated Land | The agency ears
Environment & Coastal Management | 'SPonse on 10 July 2Uilc.
Heritage Protection Matters A copy of the response is
attached.
Advice Department Of Wetlands The agency provided its
Environment & ‘ ; response on 16 July 2012.
Heritage Protection a A A copy of the response is
attached.

 

 

 

 

 

 

[6. APPROVED PLANS _

is

The following plans are Approved Plans for the development:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approved Plans

Plan No. Rev. | Plan Name ; _| Date

2869 DA-00 F Locality Plan, prepared by Leffler Simes 04/06/14
Architects

2689 DA-01 A Existing Site Conditions, prepared by | 13/04/12
Leffler Simes Architects

2869 DA-03 F Site Plan, prepared by Leffler Simes | 04/06/14
Architects

2869 DA-04 F Floor Plan, prepared by Leffler Simes | 04/06/14
Architects

2869 DA-05 E Roof Plan, prepared by Leffler Simes | 23/05/14
Architects

2869 DA-06 E Elevation, prepared by Leffler Simes 25/07/13

2869 DA-08 F Sections, prepared by Leffler Simes 23/05/14

2869 DA-09 E Easement Plan, prepared by Leffler | 23/05/14
Simes

2869 DA-11 A Typical Details, prepared by Leffler Simes | 26/05/14

2869 DA-12 B Sections with Sight Lines, prepared by | 23/05/14
Leffler Simes

2869 DA-020 G Site Plan - Stage 1, prepared by Leffler | 04/06/14
Simes Architects

2869 DA-21 B Tenancy Floor Plan and Elevations, | 23/05/14
prepared by Leffler Simes Architects

 

 

 

 

 

 

Page 9

 

 
Log in to download the original file

8. Appendix E - Previous Approval.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.