Original source · versioned page text
8. Appendix E - Previous Approval
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
37. 38. 39. 40. 41. version of the Water Sensitive Urban Design Technical Design Guidelines for South East Queensland, and must include in particular: (a) stormwater quality treatment devices of a size and location generally in accordance with those shown in section 5 of the of the Site Based Stormwater Management Plan listed in this Decision Notice. (b) bioretention devices which: (i) are designed generally in accordance with IPWEQA Standard Drawing No. WSUD-001. (ii) incorporate a coarse sediment forebay (in addition to the required filter media surface area), which is sized in accordance with the latest version of the Water Sensitive Urban Design Technical Design Guidelines for South East Queensland and designed generally in accordance with IPWEQA Standard Drawing No. WSUD-005. (iii) | have safe, unobstructed and all weather access from the road frontage for maintenance purposes, particularly for the coarse sediment forebay. (iv) are provided with a high flow bypass to ensure that flows which exceed the treatment capacity of the device are bypassed in order to avoid damaging of the filter media or subjecting the filter media to excessive sediment loads. (v) are provided with a free-draining outlet from the sub-soil drainage system. (vi) treat stormwater from all developed catchments (including roof and carpark catchments) prior to discharge. Permanent educational signage must be erected to educate the customers to the development about the function of the bioretention device(s). The dimensions, standard, presentation and location of the educational signage must be in accordance with an Operational Works approval. *(Refer to Advisory Note) Vegetated Devices All stormwater quality treatment devices must be maintained in accordance with the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved Operational Works drawings for the stormwater quality treatment system and detailed life cycle costing of the system must be attached as an addendum to this document. Records of all maintenance activities undertaken must be kept and made available to Council upon request. Rainwater Harvesting Operating rainwater collection tanks must be provided for the development. The tanks must be provided in accordance with an Operational Works approval and must include in particular: (a) the details identified in section 5 of the Site Based Stormwater Quality Management Plan listed in this Decision Notice (b) a total tank capacity of 50 000 litres (d) re-use of harvested rainwater for internal non-potable uses and outdoor uses. Certification must be submitted to Council from a qualified person* which certifies that the rainwater collection tank and associated reticulation have been installed in accordance with the requirements of this Decision Notice. *(Refer to Advisory Note) Easements Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.