Skip to the record
For the highest quality transcripts.

Original source · versioned page text

8. Appendix E - Previous Approval

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

The following plans require amendment prior to becoming Approved Plans for the development:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Plans Requiring Amendment
‘Plan No. | Rev. | Plan Name Date
‘Amendments
[7.__REFERENCED DOCUMENTS ne]
The following documents are referenced in the assessment manager conditions:
Referenced Documents
N-B9083.20 B Site Based Stormwater Management | 05
Plan, prepared by OPUS International | October
Consultants 2012

 

The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:

Equitable Access and Facilities

The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in
addition to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:

(a) the Disability Discrimination Act 1992 (Commonwealth);
(b) the Anti-Discrimination Act 1991 (Queensland); and

(c) the Disability (Access to Premises — Buildings) Standards
Aboriginal Cultural Heritage Act 2003

There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.

The ACH Act establishes a cultural heritage duty of care which provides that: “A person
who carries out an activity must take all reasonable and practicable measures to ensure
the activity does not harm Aboriginal cultural heritage.” \t is an offence to fail to comply
with the duty of care. Substantial monetary penalties may apply to individuals or
corporations breaching this duty of care. Injunctions may also be issued by the Land and
Resources Tribunal, and the Minister administering the Act can also issue stop orders for
an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.

You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss
any obligations under the ACH Act.

Unitywater

Connection to Unitywater live water mains must be undertaken by Unitywater at the
applicants cost.

A Trade Waste permit is required prior to any stormwater, groundwater or sump pump
discharge into Unitywater’s sewerage system.

 

Page 10
Log in to download the original file

8. Appendix E - Previous Approval.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.