(d) (e) (f) the site must be maintained so there is no sediment run-off onto adjacent premises, roads or footpaths. the site must be maintained to ensure no nuisance to adjacent premises, roads or footpaths. where fencing is installed to secure boundaries: (i) the fencing must be durable and not capable of being pushed or blown over. (ii) the fencing type must not detract from local amenity (barbed wire is not acceptable). (iii) | vandalism must be promptly repaired and any graffiti removed. Retention of Existing Trees 24. Existing trees in the covenant area and in the road verge must be retained in accordance with an Arborist Report submitted for operational works for the development prepared by a qualified person and referenced in a Development Permit for Operational Works. FAUNA MANAGEMENT Fauna Management Plan 25. Prior to the commencement of any works over the subject land, a detailed Fauna Management Plan (FMP) must be lodged and approved by council delegate. 26. |The FMP must include the following information: (a) Staging of the clearing, (i) areas to be cleared. (ii) proposed dates for clearing. (iii) if fauna spotter presence is needed in each and every stage. (b) The Fauna Spotter is to: (i) Provide a copy of the QPWS Rehabilitation Permit of the fauna spotter catcher. (ii) An assessment of the fauna likely to be impacted, (iii) Ensure the clearing is conducting in a lawful manner. (iv) Contact details of the nearest wildlife animal specialist veterinarian or other appropriate party to humanely deal with injured wildlife. (v) Provide comment on the clearing with relation to the provision contained within SEQ Koala Conservation State Planning Regulatory provisions Table 7 , column 2, parts 4 -7. Clearing of Vegetation 27. Prior to the commencement of any works over the subject land, a Vegetation Management Plan must be lodged with any operational works permit application. The plan must document the following items: (a) (b) Vegetation removal, tree felling and lopping must be undertaken in an environmentally sensitive manner that avoids damaging surrounding vegetation, trees and habitat. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- (i) Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.