Original source · versioned page text
8. Appendix E - Previous Approval
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
(ii) Disposal for firewood. (iii) | Disposal for landscaping purposes (iv) | Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose (v) Re-use for construction materials (vi) | Environmental weed species (camphor laurel, lantana) cleared from the site shall not be mulched, with the material to be removed from the site and disposed of in a Council approved refuse tip. (vii) Disposal of cleared vegetation by burning or burying is not permitted. CIVIL ENGINEERING UNIT 28. 29. 30. 31. 32. 33. Easements Prior to the commencement of use, a 9 metre wide easement for access purposes must be registered against the title of Lot 1 SP222982 in favour of Lot 2 SP222982 over the land area along the southern boundary of Lot 1 SP222982. Site Access and Driveways A sealed access driveway must be provided from Hofmann Drive and the Eenie Creek Road service road to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval. Parking A minimum of 246 car parking and 4 motorcycle spaces must be provided and marked within stage 1, 34 car parking and 2 motorcycle spaces must be provided and marked within stage 2. The works must be undertaken in accordance with an Operational Works approval. , Motorcycle parking is to be provided in a location close to the entrance of the buildings. All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Service Vehicles Service vehicle parking, manoeuvring and standing spaces must be provided on the site. The works must be undertaken in accordance with an Operational Works approval. Pedestrian and Bicycle Facilities Pedestrian and bicycle facilities must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: (a) a 2.5 metre wide footpath within the Hofmann Road verge extending from the existing footpath adjacent to the roundabout at the entrance to the site to the existing footpath adjacent to the next roundabout to the northeast. (b) pedestrian pathways extending through the middle of the carpark generally in accordance with the approved plans. (c) adequate separation of all specific pedestrian routes from vehicle access and manoeuvring areas, and clear demarcation by pavement marking, signposts or changes in surface materials or levels. (d) signage and lighting at strategic locations to direct people to building entries and public toilet facilities. Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.