8. Appendix E - Previous Approval

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

(ii) Disposal for firewood.
(iii) | Disposal for landscaping purposes

(iv) | Transport to alternative site for breaking down materials provided that all
necessary permits have been obtained to allow the alternate site to be
used for this purpose

(v) Re-use for construction materials

(vi) | Environmental weed species (camphor laurel, lantana) cleared from the
site shall not be mulched, with the material to be removed from the site
and disposed of in a Council approved refuse tip.

(vii) Disposal of cleared vegetation by burning or burying is not permitted.

CIVIL ENGINEERING UNIT

28.

29.

30.

31.
32.

33.

Easements

Prior to the commencement of use, a 9 metre wide easement for access purposes must
be registered against the title of Lot 1 SP222982 in favour of Lot 2 SP222982 over the
land area along the southern boundary of Lot 1 SP222982.

Site Access and Driveways

A sealed access driveway must be provided from Hofmann Drive and the Eenie Creek
Road service road to all parking and manoeuvring areas of the development. The works
must be undertaken in accordance with an Operational Works approval.

Parking

A minimum of 246 car parking and 4 motorcycle spaces must be provided and marked
within stage 1, 34 car parking and 2 motorcycle spaces must be provided and marked
within stage 2. The works must be undertaken in accordance with an Operational Works
approval. ,

Motorcycle parking is to be provided in a location close to the entrance of the buildings.

All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.

Service Vehicles

Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval.

Pedestrian and Bicycle Facilities

Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:

(a) a 2.5 metre wide footpath within the Hofmann Road verge extending from the
existing footpath adjacent to the roundabout at the entrance to the site to the
existing footpath adjacent to the next roundabout to the northeast.

(b) pedestrian pathways extending through the middle of the carpark generally in
accordance with the approved plans.

(c) adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels.

(d) signage and lighting at strategic locations to direct people to building entries and
public toilet facilities.

 

Page 5
Log in to download the original file

8. Appendix E - Previous Approval.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.