Original source · versioned page text
8. Appendix E - Previous Approval
Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
(e) () (9) pedestrian refuge areas at strategic locations within the carpark to ensure safe and convenient congregating of pedestrians waiting to cross major access driveways a total of 30 bicycle parking spaces for stage 1, and 10 bicycle parking spaces for stage 2, which are to be located close to the entrance of the building. end of trip facilities involving 15 lockers, 2 showers and change rooms for stage 1, and 5 lockers, 1 shower and change rooms for stage 2. HYDRAULICS & WATER QUALITY Stormwater Drainage The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and QUDM, and must include in particular: 35. 36. (a) (b) (c) (d) (e) *(Refer to Advisory Note) Stormwater Quality Management the works described in section 3 and 5 of the Site Based Stormwater Management Report listed in this Decision Notice. collection and discharge* of stormwater to Hoffman Drive. extension of the site stormwater system to accommodate stormwater from the external catchment as nominated and shown in section 4 of the site based stormwater management report. Design calculations and comments outlining how external stormwater flows will be managed through the site from the external upstream catchment as proposed in section 4 of the site based stormwater management plan. Any final design must include: (i) a site based drainage system which accepts and conveys existing minor flows from Eenie Creek Road, Commerce Court and existing industrial development to the west. Detailed design calculations must be submitted with a concurrent operational works application which demonstrates no additional afflux on upstream private and public land. (ii) a site based drainage system which accepts and conveys external upstream major flows up to and including the 1% AEP flood event, without increasing afflux to existing upstream private and public land. (iii) analytical justification that demonstrates design flows can enter any proposed underground drainage system under appropriate blockage conditions. (iv) potential effects of flows in excess of the design flow including the consequences of the Probable Maximum Flood. (v) allowances made in the design for debris blockages of the inlet. (vi) potential effects of debris blockages in excess of that allowed for in the design. (vii) | an easement for drainage purposes to be registered against the title of the property in favour of Council over the land and drainage system which conveys external flows through the site. The easement must be granted at no cost to council. the use of gravity stormwater drainage and not surcharge pits. A stormwater quality treatment system must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and the latest Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.