SAFETY IN DESIGN HAZARD REPORT
App? Action
Consideration Hazard / Comment Controlling Action Action By
Status
Unusual or atypical design features Fall hazard associated with high Safety fences to be provided where hazard Designer/ During
retaining walls, deep excavations and exists as per Operational Works Design Landscape Construction
works around services. Drawings. Engineering design to specify Architect/Co
interim star picket safety fencing for
Operational Works drawings prior to
ntractor
establishment of vegetation. Contractor and
superintendent to identify risk prior to
construction occurring.
Construction:
Method of construction Conventional hazards associated with All works to be undertaken in accordance Contractor During
subdivision works applies with the requirements of the subdivision Construction
guidelines and operational works in
accordance with WH&S requirements.
Access Access to the site via public roads and Engineering plans refer to provision of Contractor During
requires adequate traffic management adequate traffic control by the contractor as Construction
a part of the operational works in
accordance with WH&S requirements
Crane / Plant requirements All hazards associated with plant All works to be undertaken in accordance Contractor During
operations for subdivision works with WH&S requirements including work Construction
applies method statements for operation of plant as
required
Maintenance:
Method of maintenance Addressed in Concept Stormwater All structures designed in accordance with Designer Complete
Management Construction and Council and Water by Design standards.
Maintenance Plan (Report No. Engineering plans forwarded to Council for
B14158.W-05B dated November Operational Works approval. Appropriate
2015) Maintenance measures outlined in report.
Demolition:
Method of demolition N/A Best Practice/ Compliance
High Risk Construction Activities:
A person could fall more than 2m Injury/Death resulting from falling from Safety fencing to all walls over 1m specified Designer/Co Ongoing
retaining walls/deep excavations on drawings unless appropriate landscape
buffers provided. Contractor to ensure
ntractor
adequate fall protection (temporary fencing)
Document: QAF2024 Safety in Design Hazard Report – Generic
Revision 10 – 10/02/2015 Page 3 of 12
File: H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\B14158.W - Safety in Design_WQCP.docx [Update to show User's file] Calibre Consulting (Aust) Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.