16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

SAFETY IN DESIGN HAZARD REPORT

                                                      App?                                                                                                                         Action
                  Consideration                                           Hazard / Comment                               Controlling Action                     Action By
                                                                                                                                                                                 Status

 Unusual or atypical design features                            Fall hazard associated with high            Safety fences to be provided where hazard         Designer/         During
                                                                retaining walls, deep excavations and       exists as per Operational Works Design            Landscape         Construction
                                                                works around services.                      Drawings. Engineering design to specify           Architect/Co
                                                                                                            interim star picket safety fencing for
                                                                                                           Operational Works drawings prior to
                                                                                                                                                              ntractor

                                                                                                            establishment of vegetation. Contractor and
                                                                                                            superintendent to identify risk prior to
                                                                                                            construction occurring.
 Construction:

 Method of construction                                         Conventional hazards associated with        All works to be undertaken in accordance          Contractor        During
                                                                subdivision works applies                   with the requirements of the subdivision                            Construction
                                                                                                           guidelines and operational works in
                                                                                                            accordance with WH&S requirements.
 Access                                                         Access to the site via public roads and     Engineering plans refer to provision of           Contractor        During
                                                                requires adequate traffic management        adequate traffic control by the contractor as                       Construction
                                                                                                           a part of the operational works in
                                                                                                            accordance with WH&S requirements
 Crane / Plant requirements                                     All hazards associated with plant           All works to be undertaken in accordance          Contractor        During
                                                                operations for subdivision works            with WH&S requirements including work                               Construction
                                                               applies                                     method statements for operation of plant as
                                                                                                            required
 Maintenance:

 Method of maintenance                                          Addressed in Concept Stormwater             All structures designed in accordance with        Designer          Complete
                                                                Management Construction and                 Council and Water by Design standards.
                                                               Maintenance Plan (Report No.                Engineering plans forwarded to Council for
                                                                B14158.W-05B dated November                 Operational Works approval. Appropriate
                                                                2015)                                       Maintenance measures outlined in report.
 Demolition:

 Method of demolition                                          N/A                                         Best Practice/ Compliance

 High Risk Construction Activities:

 A person could fall more than 2m                               Injury/Death resulting from falling from    Safety fencing to all walls over 1m specified     Designer/Co       Ongoing
                                                               retaining walls/deep excavations            on drawings unless appropriate landscape
                                                                                                            buffers provided. Contractor to ensure
                                                                                                                                                              ntractor

                                                                                                            adequate fall protection (temporary fencing)
Document: QAF2024 Safety in Design Hazard Report – Generic
Revision 10 – 10/02/2015                                                                                                                                                        Page 3 of 12
File: H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\B14158.W - Safety in Design_WQCP.docx [Update to show User's file]                        Calibre Consulting (Aust) Pty Ltd
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.