Skip to the record
Search everything, all in one place.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

SAFETY IN DESIGN HAZARD REPORT

                                                      App?                                                                                                                     Action
                  Consideration                                           Hazard / Comment                               Controlling Action                 Action By
                                                                                                                                                                             Status
                                                                                                            is provided to retaining walls over 1m in     /Landscape
                                                                                                            height                                        Architect
                                                                                                            Safety fences to be provided where hazard
                                                                                                            exists as per Operational Works Design
                                                                                                            Drawings
 Work is on a telecommunication tower                   
 Involves demolition of an element of a
 structure that is load-bearing or otherwise            
 related to the physical integrity of the structure
 Involves, or is likely to involve, the disturbance
 of asbestos                                            
 Involves structural alterations or repairs that
 require temporary support to prevent collapse          
 In or near a confined space                                    Structures and manholes                     Undertake works in accordance to Council      Designer /        Ongoing
                                                                                                            standards. Construction procedures to be      Contractor
                                                                                                           undertaken in accordance with WH&S
                                                                                                            requirements.
 In or near a shaft or trench with an excavated                 Excavation depths are anticipated to        Undertake work in accordance to Council       Designer/         Ongoing
 depth greater than 1.5m or is carried out in or                exceed 1.5m                                 standards. Construction procedures to be
 near a tunnel                                                                                             undertaken in accordance with WH&S
                                                                                                                                                          Contractor

                                                                                                            requirements.
 Involves the use of explosives                         
 Is carried out in or near                              
          Pressurised gas distribution mains or
           piping                                       
          Chemical, fuel or refrigerant lines          
          Energised electrical installations or
           services                                     
 Involves tilt-up or precast concrete                           Precast stormwater manholes                 All works to be undertaken in accordance      Contractor        During
                                                                                                           with WH&S requirements including work                           Construction
                                                                                                            method statements



Document: QAF2024 Safety in Design Hazard Report – Generic
Revision 10 – 10/02/2015                                                                                                                                                    Page 4 of 12
File: H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\B14158.W - Safety in Design_WQCP.docx [Update to show User's file]                    Calibre Consulting (Aust) Pty Ltd
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.