SAFETY IN DESIGN HAZARD REPORT
App? Action
Consideration Hazard / Comment Controlling Action Action By
Status
On, in or adjacent to a road, railway, shipping Potential injury or death to existing Engineering plans refer to provision of Contractor During
lane or other traffic corridor that is in use by road users as the result of construction adequate traffic control by the contractor as Construction
traffic other than pedestrians works a part of the operational works in
accordance with WH&S requirements. This
may also include interim fencing for the site
including signage
In an area at a workplace in which there is any All hazards associated with plant All works to be undertaken in accordance Contractor During
movement of powered mobile plant operations applies with WH&S requirements including work Construction
method statements for operation of plant as
required and site inductions for all visitors
In an area in which there are artificial
extremes of temperature
In or near water or other liquid that involves a Project involves construction of a small Appropriate safety fencing and warnings Contractor During
risk of drowning pond. This may pose a potential signs to be erected during construction. Construction
drowning risk. Area to be avoid during periods of rainfall.
The following safety measures have been Designer Complete on
incorporated into the basin design plans
Thick planting and safety bench around
the perimeter of the pond to discourage
entry into pond
Retaining walls over 1m are to be
fenced. Maximum height is 2.1m.
There are multiple points around the
basin with batter slopes flatter than 1 in
5 to enable easy access out of the basin
area
1 in 6 access track provided at the
downstream end of the basin
Therefore access to the water edge is
limited and the water edge is densely
planted on a safety bench. No edge of water
fencing is required.
Document: QAF2024 Safety in Design Hazard Report – Generic
Revision 10 – 10/02/2015 Page 5 of 12
File: H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\B14158.W - Safety in Design_WQCP.docx [Update to show User's file] Calibre Consulting (Aust) Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.