Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

SAFETY IN DESIGN HAZARD REPORT

                                                      App?                                                                                                                         Action
                   Consideration                                          Hazard / Comment                               Controlling Action                     Action By
                                                                                                                                                                                 Status



 Involves diving work                                   
 Emergency Management

 Fire / Bushfire                                        
 Emergency Services Access                                      Potentially required throughout the         Contractor to ensure that clear access is         Contractor        Ongoing
                                                               duration of construction                    available at all times for emergency vehicles
 Hazardous Manual Tasks:

 A task that requires a person to lift, lower,                  Accident/Injury/Death resulting from        Contractor to ensure all works on-site            Contractor        Ongoing
 push, pull, carry or otherwise move, hold or                   manual task.                                comply the WH&S requirements and that
 restrain any person, animal or thing involving                                                            SWMS are prepared for each activity as
 one or more of the following:                                                                              required.
       repetitive or sustained force
          high or sudden force                                 Accident/Injury/Death resulting from        Contractor to ensure all works on-site            Contractor        Ongoing
                                                                manual task.                                comply the WH&S requirements and that
                                                                                                           SWMS are prepared for each activity as
                                                                                                            required.
          repetitive movement                                  Accident/Injury/Death resulting from        Contractor to ensure all works on-site            Contractor        Ongoing
                                                                manual task.                                comply the WH&S requirements and that
                                                                                                           SWMS are prepared for each activity as
                                                                                                            required.
          sustained or awkward posture                         Accident/Injury/Death resulting from        Contractor to ensure all works on-site            Contractor        Ongoing
                                                                manual task                                 comply the WH&S requirements and that
                                                                                                           SWMS are prepared for each activity as
                                                                                                            required.
          exposure to vibration                                Accident/Injury/Death resulting from        Contractor to ensure all works on-site            Contractor        Ongoing
                                                                manual task.                                comply the WH&S requirements and that
                                                                                                           SWMS are prepared for each activity as
                                                                                                            required.
 Earthworks:

 Staging                                                

Document: QAF2024 Safety in Design Hazard Report – Generic
Revision 10 – 10/02/2015                                                                                                                                                        Page 6 of 12
File: H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\B14158.W - Safety in Design_WQCP.docx [Update to show User's file]                        Calibre Consulting (Aust) Pty Ltd
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.