16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

SAFETY IN DESIGN HAZARD REPORT

                                                      App?                                                                                                                        Action
                  Consideration                                           Hazard / Comment                               Controlling Action                    Action By
                                                                                                                                                                                Status

 Method of excavation & plant requirements                      Conventional plant required for             Contractor to ensure all works on-site           Contractor        Ongoing
                                                                excavation works                            comply the WH&S requirements and that
                                                                                                           SWMS are prepared for each activity as
                                                                                                            required.
 Earthworks balances and location of stockpile                  spoil area for topsoil                      Contractor to ensure all works on-site           Contractor        Ongoing
 material                                                                                                   comply the WH&S requirements and that
                                                                                                           SWMS are prepared for each activity as
                                                                                                            required.
 Depth of excavations                                           Deep excavations for services               Contractor to ensure all works on-site           Contractor        Ongoing
                                                                                                            comply the WH&S requirements and that
                                                                                                           SWMS are prepared for each activity as
                                                                                                            required.
 Adjacent properties affected by earthworks /                   Damage or injury to adjacent                Contractor to ensure all works on-site           Contractor        Ongoing
 excavations                                                    residents/unauthorised access to site.      comply the WH&S requirements and that
                                                                                                            SWMS are prepared for each activity as
                                                                                                           required. Contractor to ensure that adjacent
                                                                                                            properties are protected at all times during
                                                                                                            construction. Site controls to be
                                                                                                            implemented to avoid unauthorised access.
 Road / Pavement / Carpark Design:

 Road alignment and cross section                       
 Pavement materials                                     
 Provision for pedestrians, cyclists, public
 transport, heavy vehicles, emergency                   
 vehicles, maintenance operations
 Noise generation                                       
 Lighting                                               
 Crime prevention                                       
 Edge protections / guardrails / barriers               
 Drainage                                                      Conventional                                Comply to Standards                              Designer          Complete



Document: QAF2024 Safety in Design Hazard Report – Generic
Revision 10 – 10/02/2015                                                                                                                                                       Page 7 of 12
File: H:\B14\150-199\B14158.W\01 Final Layout Op Works\Checklists\B14158.W - Safety in Design_WQCP.docx [Update to show User's file]                       Calibre Consulting (Aust) Pty Ltd
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.