16-001014-02A (Ultimate SCMMP)
Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Photos taken and attached to this
form
Inlet pipe and headwall at correct
locations and levels (+ 25 mm)
Inlet zone connection pit or pipe
correction size, location and level (+
25 mm)
Outlet riser connection, location, size
and levels or risers correct (+ 25 mm)
Outlet pipe and headwall at
correction locations and level (+ 25
mm)
Bypass weir correct width and level
(+ 25 mm)
Maintenance pipe and valve installed
at correct location and level
Maintenance access installed to inlet
zone
Rock or concrete base constructed to
inlet zone
Rock protection provided at correct
locations and rock size consistent
with design
Seepage collars installed to all pipe
outlets from wetland
HOLD POINT: Superintendent AND Wetland Designer inspection and review of test results and certifications
before proceeding.
Comments (attach and refer to additional pages if necessary)
NB: As-constructed survey or drawings and photos attached.
Signed by superintendent:
Print name:
Date:
AND
Signed by wetland designer:
Print name:
Date:
FORM D — Topsoil and Finished Levels
Purpose: To ensure the topsoil is installed to the correct depth and finished levels of wetland are correct and meet the
design.
Items Checked Satisfactory Action (if unsatisfactory) Initial
Topsoil meets the requirements of
AS4419 and laboratory tests
provided
6
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – CONSTRUCTED WETLANDS
Version 1, February 2009© South East Queensland Healthy Waterways Partnership 2010
©South East Queensland Healthy Waterways Partnership 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.