Skip to the record
For the highest quality transcripts.

Original source · versioned page text

16-001014-02A (Ultimate SCMMP)

Attached to the e-mail Operational Works Application OPW16/0203 - 4 of 4.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Topsoil has been screened and is
free of large debris
Topsoil applied to wetland to a
minimum 300 mm depth
As-constructed survey of wetland
surface and surrounding bunds
completed
Final topsoil levels are consistent
with design levels (+ 50 mm). THIS
IS CRITICAL IN THE
MACROPHYTE ZONE.
Surface is smooth and free of local
depressions and debris

HOLD POINT: Superintendent and wetland designer inspection and sign-off before proceeding.

Comments (attach and refer to additional pages if necessary)




NB: As-constructed survey or drawings and photos attached.


Signed by superintendent:
Print name:
Date:
AND
Signed by wetland designer:
Print name:
Date:

FORM E — Building Phase (Macrophyte) Protection
Purpose: To ensure protective measures are correctly installed to protect the macrophyte zone during establishment
while building is occurring in the catchment.

Items                                          Checked        Satisfactory       Action (if unsatisfactory)                               Initial

Silt fences installed around all
elements of wetland
High-flow bypass channel protective
measures in place (i.e. turf installed
and where required reinforced turf)

                                                                                                                                              7
                  CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – CONSTRUCTED WETLANDS
                                                     Version 1, February 2009© South East Queensland Healthy Waterways Partnership 2010
©South East Queensland Healthy Waterways Partnership 2009
Log in to download the original file

16-001014-02A (Ultimate SCMMP).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.