Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                                                        Noosa on Weyba
                                                                                      Water Supply and Sewerage Analysis




3              Desired Standards of Service
Unitywater adopt the South East Queensland (SEQ) Design and Construction Code (July 2013) as the basis
for water supply and sewerage planning. Cardno have adopted these codes to assess the Noosa on Weyba
development.

3.1     Water Supply
The key aspects of the adopted Desired Standards of Service (DSS) for water supply planning are detailed in
Table 3-1.

Table 3-1      Adopted Water Supply Network Planning DSS
 Item                              Detail
                                   280 L/EP/d.
 Average Day (AD)
                                   Based on 230 L/EP/d + allowance for leakage/losses (50 L/EP/d).

 Peaking Factors


                                   Low/Medium Density     High      Density
 Category                                                                     Commercial/Industrial
                                   Residential            Residential

 Mean Day Maximum Month
                                   1.5                    1.5                 1.5
 (MDMM:AD)

 Peak Day (PD:AD)                  2                      2                   2

 Peak Hour (PH:PD)                 2                      1.75                1.4
                                   Detached Res (<= 3 stories)– 15Ls for 2hrs w background Demand highest of 2/3
                                   PH or AD
                                   Multi story Res => 4 levels – 30L/s for 4 hours w background Demand highest of
 Fire Fighting Flows
                                   2/3 PH or AD
                                   Commercial/Industrial buildings – 30L/s for 4 hours w background Demand of PH
                                   demand (between 10am and 4pm)
                                   21m at property boundary (under normal operating conditions (PH))
 Minimum Pressure
                                   12m min at the main at the hydrant; Min of 6m




Northbrook Corporation Pty. Ltd.                       Version 4                                       17 September 2013
5101-19                                          Commercial in Confidence                                        Page 3

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12_0208.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.