Original source · versioned page text
Att 2 - Traffic Plan
Attached to the e-mail Retail Bus Type 2 Shop & Salon, Multiple Housing Type 4 Conventional (2 units) & Boundary Realignment (3 lots into 3) - MCU18/0158 & RAL18/0017.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn34 Elm St, Cooroy Figure 7 – Diamond Lane, view to the East 3.1 Diamond Lane / Elm St / Wessel Petroleum / Cooroy Motel Intersection The Wessel Petroleum and Cooroy Motel access to Diamond Lane is located approximately 8m from the Elm St intersection. It is also located approximately 25m from the location where the slip lane from Diamond St joins Elm St. The location and alignment of these intersections are non- compliant with current standards. The proposed development would remove the Cooroy Motel access onto Elm St and Diamond Lane. Removing the access to Elm St is in line with the requirement to limit direct access to major roads. The removal of the access to Diamond Lane will significantly improving the safety of the intersection. Furthermore, the proposed development will reduce the volume of traffic directed towards the non-compliant Diamond Lane / Elm St / Wessel Petroleum access. Some the traffic generated by the Cooroy Motel contributes to the number of vehicles traversing this intersection. The Guide to Traffic Generating Developments by the Road and Traffic Authority (RTA) was used to estimate the volume of traffic generated by the Cooroy Motel. Based on the assumption of 25 units, with 85% occupancy and a caretaker’s residence, it is estimated that the Cooroy Motel currently contributes approximately 73 vehicle trips per day. It is expected that approximately 50% of these trips will utilise the Diamond Lane / Elm St intersection. The proposed development will have two dwelling units accessing Diamond Lane. Based on the Guide to Traffic Generating Developments, each of these units can be expected to generate between 4 and 5 vehicle trips per day resulting in an expected total trip generation of 9 vehicle trips per day. It can be expected that the majority of the vehicle trips will travel through the Diamond Lane / Elm St intersection. The proposed development will decrease the amount of traffic to the Diamond Lane / Elm St intersection by approximately 27 trips per day. 360 Civil Consulting - Traffic Assessment Page 15 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.