2015-03-31 Infrastructure and Services Committee Meeting Agenda

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                  31 MARCH 2015


The following points are provided to support the officers’ recommendation to rehabilitate the
entire structure under the Full Scope Option C);
•       Based on the consulting engineer’s advice, the full scope of rehabilitation works are
        required to be completed by 2018 or sooner.
•       The specialist nature of the works carries the risk that should the works not be constructed
        under a single contract the procurement of a number of contractors over a number of years
        may introduce avoidance of liability issues and additional costs.
•       Engineering investigations to other concrete bridges – Sheraton, Witta Circle and Doonella,
        all constructed at a similar time are showing similar signs of concrete cancer and expected
        to require rehabilitation in coming years. Any delay to Munna Point bridge would compound
        the scope of the bridge capital works program and place the Council at risk as the
        engineering consultant has informed Council that the minimum Option A) must occur
        immediately.

Previous Council Consideration

A formal report has not been presented to Council, however a presentation was provided to
Council on 25 March 2014 on the option to rehabilitate the bridge as opposed to reconstruction
as previously proposed by Sunshine Coast Council.

Finance & Risk

The rehabilitation of Munna Point Bridge will be funded by renewal funding. The shortfall from the
current budget of $1.4 million to the required estimate of $3.05 million will mean a transfer of
funds from the renewal contingency budget in the 2015/16 capital program subject to approval by
Council.

Consultation

External Consultation - Community & Stakeholder

Department of Infrastructure and Regional Development
Tod Consulting Engineers

Internal Consultation

Nil

Departments/Sections Consulted:

      Community Services                        X   Planning & Infrastructure
      Disaster Management & Public Order            Building & Plumbing Services
      Waste & Environmental Health                  DA Planning
      Community Facilities                          Strategic Land Use Planning
      Cultural Facilities                       X   Asset Design & Investigations
                                                    Asset Planning
                                                    Civil Operations
                                                    Environment

      Executive Office                          X   Corporate Services
      Community Engagement                      X   Finance
      Customer Service                              ICT
      Executive Support                             Procurement & Fleet
      Governance                                    Property & Facilities
      Human Resources                               Revenue Services




                                                                                     Page 20 of 29
Log in to download the original file

2015-03-31 Infrastructure and Services Committee Meeting Agenda(PDF, 862KB).pdf · 882 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.