           ENVIRONMENTAL MANAGEMENT PLAN (EMP)
           Noosa Bunnings
                                                                                         14(




            Works phase
           Should any Acid Sulphate material or any contaminated soil be discovered it
           will be classified and disposed of to a legally operating waste management
           facility. Records of disposed waste will be kept in project records


           Waste material generated by the works will be minimised or recycled where
           feasible and cost effective.



           All waste material that cannot be recycled will be collected and removed from
           the site to be disposed of in a legal manner, i.e. at a legally operating waste
           management facility. A register of disposed waste will be kept on site.

           Bins with heavy lids will be provided within the site compound for personal
           litter.



           Bin lids will be kept closed at all times, and all bins will be emptied when they
           are three-quarters full.


           A daily inspection will be carried out to ensure the worksite is left in a rubbish
           free state.


           All loads of rubbish will be securely covered to prevent spillage during removal



           No waste is to be burnt or buried on site.



           Post-works phase
           The worksite will be left in a tidy and rubbish free state upon completion of the
           project.




Document No: QMS-EMP-C'     Authonsed by               Blacklaw Civil Contractors   Head Office             Telephone      5442 3300
Date _a^ ary 2C11            a   ,4e^•e^' -ans Raun)   ASN 77 106 750 724           100 Sandalwood Lace     Facsimile , 7 5442 3399
Version                     Author                                                  Forest Glen OLD 455E    [email protected]
Next Review -s"_arv20'-              '.:a, Tia«Qnl
                                                                                                                          Page 16 of 20

Used in these records

About this file

File size
57.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Plans for approval - Bunnings Warehouse.pdf · 57.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.