ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Noosa Bunnings
•1^:^III^I_^^f^:
Pre-works phase
The site compound will include amenity sheds, portable toilets, and plant and
equipment storage area.
The site compound will be protected from theft and vandalism using security
fencing. All equipment that could be damaged or stolen is to be stored in teh
secured compound.
Environmental safeguards will be established at the site compound as outlined
in previous sections
Post-works phase
The compound site will be left in a tidy and rubbish free state upon completion
of the project
Document No: QMS-EMP-0 Authonsed by Btacklaw Civil Contractors Head Office Telephone 5442 3300
Date a•-.:ary 2017 Va 3ge ^e: •-'a••s Raun) ABN 77 106 750 724 100 Sandalwood Lane Facsimile =442 3399
Verson ' Author Forest Glen OLD 4555 [email protected]
Next Review: ,anuary 20'. arz; t.arren)
Page 17 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Plans for approval - Bunnings WarehouseRelated documentApplication case desk ↗
About this file
- File size
- 57.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.